background image

 The inverter only needs to communicate with the host (Pack1).

 

When multiple batteries are connected with multiple inverters, it is best to connect 

    

through the combiner box. If it is not connected through the combiner box, the 

    

wiring mode shall be confirmed with the manufacturer's agent.

 

And the cable from 

    

each battery to the inverter remains the same length.

 Batteries are not allowed to be connected in series.

 Different batteries with different chemistries, different batches of batteries from the 

    

same chemistry and technical design parameters can not be bundled and used 

    

together.

Notice

5.System tuning

5

.

1

 

Check before power on

NO.

1

2

3

4

5

6

7

8

Inspection items

Acceptance criteria

The energy storage battery is 

installed in place

Reasonable cable layout

Beautiful binding of cable ties

Reliable grounding

Disconnect switch

The cable is connected in place

Insulate unused terminals and interfaces

The installation environment meets 

the requirements

The installation is correct, firm 

and reliable.

The cable layout is reasonable to meet 

the user's requirements.

The cable ties shall be uniform and no 

sharp corners shall be left at the cut.

The ground wire is connected correctly, 

firmly and reliably.

"

DC switch" and all switches connected 

to

 

energy storage are in "off" state.

The DC input line, energy storage line 

and signal line are connected correctly, 

firmly and reliably.

Install insulating tape on unused 

terminals and interfaces.

The installation space is reasonable, the 
environment is clean and tidy, and there 

is no construction residue.

After the inspection, press and hold the RST key (3 ~ 6S) and release it, the protection 
board is activated.

5

.

2

 

Battery function description

5.2.1 Buzzer action description

NO.

Mode

Description

1

2

Fault

Protection

Beep 0.25S every 1S

Beep 0.25S every 2S (except over

 

voltage protection)

Beep 0.25S every 3S (except over

 

voltage alarm)

3

Alarm

The buzzer function can be enabled or disabled by the upper computer. 
It is disabled by default.

    

Explanation

15

Содержание V-T48160

Страница 1: ...V1 0 V T48160 VTAC Volts Instruction Manual...

Страница 2: ......

Страница 3: ......

Страница 4: ...12 2 3 System diagram 7 3 1 Unpacking inspection 8 4 Electrical connection 11 3 4 Drilling safety 10 4 2 3 RS232 communication point definition 12 5 2 2 Screen 16 4 3 System connection diagram 13 2 1...

Страница 5: ...not operate under the service conditions described in this manual The installation and use environment exceeds the provisions of relevant international or national standards Disassemble change the pro...

Страница 6: ...efore using the tool please master the correct use method of the tool to avoid personal injury and equipment damage When the equipment is running the shell temperature is high and there is a risk of b...

Страница 7: ...medical help immediately Fire treatment measures In case of fire the system should be powered off under the condition of ensuring safety Use carbon dioxide FM 200 or ABC dry powder fire extinguisher...

Страница 8: ...perience can be aware of the risks that may be brought to him during a certain operation and can take measures to minimize the risks to himself or other personnel Operators operators who may come into...

Страница 9: ...appropriate specifications 2 Product introduction 2 1 Product introduction Function Li ion battery includes only battery modules which can store and release electric energy according to the requiremen...

Страница 10: ...losed when a low battery alarm signal has occurred RS232 RS232 communication interface for battery condition monitoring RS485 communication interface Used in communication parallel and for battery con...

Страница 11: ...nicate with the battery energy storage system The Inverter can be connected through CAN interface to realize the communication and control between the inverter and battery The battery can be accessed...

Страница 12: ...ansion screws M10 MSDS Transportation certificate RS232 communication line Power line 1m Parallel line Customized according to customers RS485 communication line Customized according to customers 3 2...

Страница 13: ...block the vent or cooling system Maintain the battery operating temperature for charging 0 55 C and discharging 20 60 C Do not store or install the battery in an environment of flammable or explosive...

Страница 14: ...top to bottom Ensure that the center of gravity of the body does not deviate from the edge of the ladder 3 4 Drilling safety The following safety precautions shall be considered when drilling on the w...

Страница 15: ...the battery lock the M6 40 screw at the top of the support fix the battery and place the battery to slide installation is complete 4 1 Cable connection 4 Electrical connection Anderson connector is u...

Страница 16: ...nication connects the battery with the inverter to function as duo for operations RS485 communication The additional two RS485 interfaces can be used for parallel connections with other batteries or t...

Страница 17: ...lor Description DC positive wire DC negative wire Ground wire Live Wire Naught wire Communication line 4 4 battery connection 4 4 1 Single battery connection PV PV N GND L BAT RS485 OR CAN AC_OUT AC_I...

Страница 18: ...ess of ads needs to be assigned as shown below Address 2 3 4 5 6 7 8 9 10 11 12 13 1 0 14 15 Dial switch Remark 1 2 3 4 OFF OFF OFF OFF ON OFF OFF OFF OFF ON OFF OFF ON ON OFF OFF OFF OFF ON OFF ON OF...

Страница 19: ...nterfaces The installation environment meets the requirements The installation is correct firm and reliable The cable layout is reasonable to meet the user s requirements The cable ties shall be unifo...

Страница 20: ...2 3 4 5 6 7 Addr Rem Cap Tol Cap Temp1 4 Environment temperature MOS Temperature Battery Cell Voltage Battery Pack Address Remnant capacity Total capacity Battery Temperature Env Temp MOS Temp Cells1...

Страница 21: ...arge high temperature protection PCB Protection Sample Protection NTC chg MOS dhg MOS 18 Cells Battery Cells Protection Battery Information Alarm Status NO NO Items Description Items Description 1 2 3...

Страница 22: ...voltage and the duration reaches the sleep delay time no communication no protection no balance and no current The standby time exceeds 24 hours no communication no charge and discharge no mains power...

Страница 23: ...age Charge Normal Alarm Over Charge protection Temperature Over current Fault Protection The maximum power LED flashes flashes 2 and the overcharge alarm ALM does not flash ON ON ON OFF Flash 3 OFF OF...

Страница 24: ...le into the battery wireless kit port download the wireless kit app and register the account after installation After turning on Bluetooth WiFi GSM click Add device The maximum connection range of Blu...

Страница 25: ...d Device or to add products The Message is after sales service Click the connected battery to view the following information Battery information You can view the relevant information of battery voltag...

Страница 26: ...e protection DOTP 15 16 17 19 20 21 COTP PCB Sample NTC Protection Charge MOS protection Discharge MOS protection Charge high temperature protection PCB Protection Sample Protection NTC chg MOS dhg MO...

Страница 27: ...environment Double click the main program icon to run it 6 2 Connect the upper computer Ensure that the BMS board is normally powered on and not in sleep state the crystal head of the communication li...

Страница 28: ...ADDR Intervals Close Serial port you can select the drop down item to select the serial port to communicate Note available when the serial port is not opened Baud rate you can select the drop down it...

Страница 29: ...itch control Click to enter the screenshot status and the toolbar will appear after marking out the screenshot area with the mouse Displays the flag icon of the current language country Click to switc...

Страница 30: ...he data has not been saved Clear interface data Click the button CLS to clear the real time data on the interface Record data Check Data save to database to start recording data When there is data rec...

Страница 31: ...ace to local Delete record delete the storage record of BMS board when reading the prompt no more data indicates that the reading has been completed 6 3 4 Parameter setting Interface Click the main in...

Страница 32: ...ritten into the BMS If you need to write please execute the write operation 6 3 5 System settings Interface Click the main interface tab System Config to enter the interface function Just follow the i...

Страница 33: ...ependently but only needs to meet the environment Double click the main program icon to run it Connect the computer to the battery via the USB RS485 communication cable Setting for DID Click to open t...

Страница 34: ...no tools or other parts are missing in the equipment 8 Battery storage requirements When the battery is stored it shall be placed correctly according to the identification of the packing box and shall...

Страница 35: ...The replaced products shall be handled by the company and the customer shall leave a certain time for the company to deal with the faults 10 Exemption from liability The company has the right not to c...

Страница 36: ......

Страница 37: ......

Отзывы: