background image

R

INSTRUCTION MANUAL

SOLAR HYBRID INVERTER

INTRODUCTION

USER MANUAL QR CODE

: SUN-8K-SG01LP1-EU

IN CASE OF ANY QUERY/ISSUE WITH THE PRODUCT, PLEASE REACH OUT TO US AT: [email protected]

FOR MORE PRODUCTS RANGE, INQUIRY PLEASE CONTACT OUR DISTRIBUTOR OR NEAREST 

DEALERS. V-TAC EUROPE LTD. BULGARIA, PLOVDIV 4000, BUL.L.KARAVELOW 9B

MODEL

: 11803

SKU

Thank you for selecting and buying V-TAC Product. V-TAC will serve you the 

best. Please read these instructions carefully & keep this user manual handy 

for future reference. If you have any another query, please contact our dealer 

or local vendor from whom you have purchased the product. They are 

trained and ready to serve you at the best.

Please scan the QR code to access the 

manual in multiple languages.

Содержание Deye SUN-8K-SG01LP1-EU

Страница 1: ...EUROPE LTD BULGARIA PLOVDIV 4000 BUL L KARAVELOW 9B MODEL 11803 SKU Thank you for selecting and buying V TAC Product V TAC will serve you the best Please read these instructions carefully keep this us...

Страница 2: ...ozen battery For optimum operation of this inverter please follow required speci cation to select appropriate cable size It is very important to correctly operate this inverter Be very cautious when w...

Страница 3: ...on Buttons 4 DC Switch 5 Power on off button 6 RS 485 port 7 CAN Port 8 Battery input connectors 9 Function Port 10 Meter_CON port 11 Parallel port 12 PV input with two MPPT 13 Grid 14 Generator input...

Страница 4: ...2 2 Product Size Inverter Size...

Страница 5: ...ing and build in 2 strings of MPP trackers Smart settable three stages MPPT charging for optimized battery performance Time of use function Smart Load Function 2 4 Basic System Architecture The follow...

Страница 6: ...ed in the package You should have received the items in the following package Parallel communication cable x1 Hybrid inverter x1 L type Hexagon wrench x1 Stainless steel anti collision bolt M8 80 x4 B...

Страница 7: ...vision Antenna or antenna cable Not higher than altitude of about 2000 meters above sea level Not in environment of precipitation or humidity 95 Considering the following points before selecting where...

Страница 8: ...eavy Please be careful when lifting out from the package Choose the recommend drill head as shown in below pic to drill 4 holes on the wall 82 90mm deep 1 Use a proper hammer to fit the expansion bolt...

Страница 9: ...ent protector or disconnect device is required between the battery and the inverter In some applications switching devices may not be required but over current protectors are still required Refer to t...

Страница 10: ...ed Connecting the battery with a suitable cable is important for safe and efficient operation of the system To reduce the risk of injury refer to Chart 3 2 for recommended cables All wiring must be pe...

Страница 11: ...reserved RSD 11 12 provide 12Vdc output when inverter is on ATS 230V output port when inverter is on Note For EU model 7 6 8kW 230V 50Hz 1pcs CT is needed only and the secondary side of the CT should...

Страница 12: ...3 3 3 Temperature sensor connection for lead acid battery 1 2 Temp sensor...

Страница 13: ...three terminal blocks with Grid Load and GEN markings Please do not misconnect input and output connectors All wiring must be performed by a qualified personnel It is very important for system safety...

Страница 14: ...GRID LOAD GEN PORT Region EU GRID N L N L N L LOAD GEN PORT...

Страница 15: ...ur appliance but sometimes it still causes internal damage to the air conditioner Before connecting to PV modules please install a separately DC circuit breaker between inverter and PV modules It is v...

Страница 16: ...nt PV module connection 1 Remove insulation sleeve 10 mm for positive and negative conductors 2 Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool 3...

Страница 17: ...to be clamped on the Grid live line If the data read by the CT is wrong you can try to point the direction of the CT to the grid Region EU Inverter N L N L N L N L White wire 5 6 Black wire Grid L N...

Страница 18: ...meter EASTRON SDM230 1 230V 2T 5 6 7 8 9 10 2 3 A B 4 GND 1 COM 2 5 3 6 7 GND A B L N L N 1 2 4 RS485B RS485A DDSU666 DIN RAIL METER 230V 5 60 A 800imp kWh 2 5 6 1 4 7 8 3 Region EU Inverter N L N L...

Страница 19: ...h Connection mandatory Ground cable shall be connected to ground plate on grid side this prevents electric shock if the original protective conductor fails Note When the inverter is in the off grid st...

Страница 20: ...oads Hybrid Inverter AC Breaker DC Breaker DC Breaker Do not connect this terminal when the neutral wire and PE wire are connected together E N Link This diagram is an example for application that Neu...

Страница 21: ...E L N PE Ground Generator 2 3 7 8 Inverter DC Breaker for battery SUN 8K SG 250A DC breaker G start 7 8 dry contact signal for startup the diesel generator GS diesel generator startup signal relay coi...

Страница 22: ...inverter Slave Inverter Slave Inverter Parallel AParallel B Inverter No 3 slave Inverter No 2 slave Inverter No 1 master Battery pack DC Breaker DC Breaker DC Breaker Grid Backup Load L N PE L N PE G...

Страница 23: ...e C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter Parallel AParallel B Inverter No 3 slave Inverter No 2 slave Inverter No 1 master Battery pack DC Breaker DC Breake...

Страница 24: ...r Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master...

Страница 25: ...SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master inverter C Ph...

Страница 26: ...nd Display Panel The operation and display panel shown in below chart is on the front panel of the inverter It includes four indicators four function keys and a LCD display indicating the operating st...

Страница 27: ...ton you can enter into the system setup screen which including Basic Setup Battery Setup Grid Setup System Work Mode Generator port use Advanced function and Li Batt info 4 The main screen showing the...

Страница 28: ...Main Screen Solar Page Solar Graph Grid Graph BMS Page Load Graph Battery Setting System Work Mode Grid Setting Gen Port Use Basic Setting Advanced Function Device info Grid Page Inverter Page Batter...

Страница 29: ...l enter into the power curve page Status Power Frequency CT1 CT2 External Current Sensor Power BUY Energy from Grid to Inverter L1 L2 Voltage for each Phase LD1 LD2 Internal Current Sensor Power SELL...

Страница 30: ...0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 6 7 8 9 10 11 12 13 14 15 Curr Volt Curr Temp SOC Energy Charge Fault Sum Data Details Da...

Страница 31: ...ock out all changes Enable this menu for setting parameters that require locking and cannot be set up Before performing a successful factory reset and locking the systems to keep all changes you need...

Страница 32: ...lowly charging from the solar array or grid Grid Charge Gen Charge Grid Signal Gen Signal Gen Force Battery Setting Start A 30 30 40A 40A Batt Set2 This is Battery Setup page Start 30 Percent S O C at...

Страница 33: ...or PCC Absorption Stage 14 2v 57 6v 13 4v 53 6v Float Stage Torque value every 30 days 3hr 14 2v 57 6v Gel 14 1v 56 4v 13 5v 54 0v Wet 14 7v 59 0v 13 7v 55 0v 14 7v 59 0v Lithium Follow its BMS volta...

Страница 34: ...ll only provide power to the backup load connected The hybrid inverter will neither provide power to the home load nor sell power to grid The built in CT will detect power flowing back to the grid and...

Страница 35: ...ring 18 00 01 00 when battery SOC is higher than 35 hybrid inverter will discharge the battery until the SOC reaches 35 Time Of Use Time System Work Mode Batt Grid Charge Gen 01 00 05 00 08 00 10 00 1...

Страница 36: ...equency Reconnect after trip Low voltage High frequency 51 30Hz High voltage 263 0V 48 20Hz 187 0V Grid Set2 Normal connect The allowed grid voltage frequency range when the inverter first time connec...

Страница 37: ...P PF P1 0 Q2 P2 0 Q3 Q4 P3 0 P4 0 Q1 0 0 0 0 P1 0 PF2 P2 0 PF3 PF4 P3 0 P4 0 PF1 2 400 0 000 0 000 6 000 Grid Set6 P Q It is used to adjust the inverter reactive power according to the set active pow...

Страница 38: ...oad ON Batt Battery SOC at which the Smart load will switch on Also the PV input power should exceed the setting value Power simultaneously and then the Smart load will switch on On Grid always on Whe...

Страница 39: ...0A 30 2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0...

Страница 40: ...able Generator Mode II With Generator Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Smart Load Mode III With Smart Load On Gen AC couple AC cable DC cable CT Battery Solar Grid...

Страница 41: ...tanding of the inverter s fault information we will list all possible fault codes and their descriptions when the inverter is not working properly The 1st priority power of the system is always the PV...

Страница 42: ...ck to normal state DC side over current fault 1 Check PV module connect and battery connect 2 When in the off grid mode the inverter startup with big power load it may report F20 Please reduce the loa...

Страница 43: ...in the range of specification or not 2 Check whether AC cables are firmly and correctly connected 3 Seek help from us if can not go back to normal state F56 DC busbar voltage is too low Battery voltag...

Страница 44: ...placed by the company itself during the warranty period all rights and interests of the replacement product or component belong to the company Factory warranty does not include damage due to the follo...

Страница 45: ...MPPT Tracker AC Output Data 2 times of rated power 10 S 50 2 8000 8800 Rated AC Output and UPS Power W 50 60Hz 220 230Vac single phase Split phase 2 3 phase Single Phase Output Frequency and Voltage...

Страница 46: ...dB Communication with BMS Weight kg Size mm Installation Style Warranty 40 60 45 Derating 30 dB Smart cooling RS485 CAN 32 420W 670H 233D IP65 5 years Wall mounted VDE4105 IEC61727 62116 VDE0126 AS477...

Страница 47: ...Definition of RJ45 Port Pin for BMS 10 Appendix I 1 No RS485 RS485 Pin CAN Pin 2 Meter_CON GND 3 GND 4 CANH 5 CANL 6 GND 7 RS485A 8 RS485B 1 2 3 45 678 RS485 Port CAN Port 8 7 6 5 4 3 2 1...

Страница 48: ...er 1 2 3 45 678 8 7 6 5 4 3 2 1 RS232 WIFI RS232 1 2 3 4 5 6 7 8 9 This RS232 port is used to connect the wifi datalogger Note some hardware versions hybrid inverter don t support conencting the energ...

Страница 49: ...1 Split Core Current Transformer CT dimension mm 2 Secondary output cable length is 4m 11 Appendix II Lead Outside...

Страница 50: ......

Отзывы: