Assembly
3
Fit 1 x M19 Wave Washer (26) onto each side of the Handlebar Upright Pivot Bar as
shown below.
Fit the correctly labelled (L or R) Dual Action Handlebar - Upper (3/4) and secure in place
with 1 x M8 x 25mm Hex Bolt with LOCKSEAL (22), 1 x M8 Spring Washer (23), 1 x M8 x
25mm Flat Washer (24) and 1 x D-Shape Washer (25) (Aligning the flat edges) for each side.
Tighten fully and cap off with 1 x S13 Round Cap (17).
Connect the Footplate Support Bars (5L/8R) to the Crankshaft by fitting 1 x M16 x 89mm
Shouldered Bolt (35 L/R) and 1 x M17 Wave Washer (36) through the Footplate Support Bar
Pivot Brackets (58) into the Crankshaft and then fitting 1 x 1/2” Spring Washer (37) followed
by 1 x 1/2” x 20mm Nylon Nut (38 L/R) for each side to secure the complete assembly.
Cap the 1/2” x 20mm Nylon Nut with 1 x S19 Round Cap (39) to each side.
Fitted the 4 x S17 Round Caps (62) on the Dual Action Handlebar - Lower (5/8).
Note
Ensure that the M16 Shouldered
Bolts are fully tight before finally
securing the M16 Nylon Locknuts.
One Bolt is supplied with a
RIGHT HAND THREAD for the
RIGHT HAND SIDE and must
be fitted by turning CLOCKWISE.
The other Bolt is supplied with a
LEFT HAND THREAD for the LEFT
HAND SIDE and must be fitted by
turning ANTI-CLOCKWISE.
38L
39
35L
36
37
58
Page
1
6