
the Control Knob mount hole on the upper left side of the Handlebar
Upright (2). Connect both ends of the Lower Exercise Monitor Cable (60)
and the Exercise Monitor Link Cable (61) together - pushing firmly to
ensure a good connection.
A-1.Hold the Tension Cable (59) below the metal bracket.
Guide the lower part of the INNER Cable of the Tension Control Knob (58)
into the formed metal loop on the INNER Cable of the Tension Cable.
A-2.Still holding the Tension Cable (59), pull the Tension
Control Knob (58) away from the Metal Bracket (you will notice
some resistance at this stage) and guide the INNER Cable through the
open slot in the Metal Bracket.
A-3.Slowly release the tension on the UPPER Cable and guide it
carefully into the hole in the top of the Metal Bracket.
Turn the Control Knob to position “8” to remove any slack in the Tension
Cable Assembly and fit the Control Knob (58) into the Handlebar Upright
(2) pushing firmly into position and locating in place with 1 x M5 Curve
Washer (12) and 1 x M5 x 50mm Screw (18).
Fit the Handlebar Upright Assembly (2) into place on the Main Frame (1)
using 1 x M8 x 67mm Hex Bolt (71), 1 x M8 Flat Washer (5) and 1 x M8
Nylon Lock Nut (48). Raise the Handlebar into its upright position and
place by using 1 x M10 Curved Washer (70) and 1 x M10 Locking Knob
locate in (69). Tighten the Hex Bolt and the Locking Knob.
2
Note
Assembly
Assembly of this stage
may be easier with 2 people
Pass the Tension Cable (59) up the Handlebar Upright (2) and out through
Page 17
58
71
5
2
48
1
70
60
69
12 18
58
59
2
59
61
A-1
A-2
A-3
A-4
58
59
Содержание FC2107-UK Series
Страница 2: ......