Note
Beny Sports Co. UK Ltd
Unit 8, Riparian Way,
The Crossings, Cross Hills,
West Yorkshire.
BD20 7BW
Carefully unpack each component, checking against the parts list that
you have all the necessary parts to complete the assembly of your
product.
Please note that some of the parts may be pre-fitted to major
components, so please check carefully before contacting our
CUSTOMER SUPPORT team.
In any event, please do not return the product to your retailer before
contacting us first.
Tel:- 01535 637711 or
Fax:- 01535 637722 or
E-mail:- [email protected]
CUSTOMER SUPPORT is open from 9.00am to 5.00pm from Monday
to Friday
Assembly & Adjustments
Do NOT FULLY TIGHTEN any
Bolts, Nuts or Fittings at this
stage unless specifically
instructed to do so.
6
5
23
4
3
16
3
5
6
15
23
Attach the Front and Rear Stabilisers (15 & 4) to the Main
Frame (16) using 4 x M8 x 55mm Carriage Bolts (3), 4 x M8
Flat Washers (5), 4 x M8 Spring Washers (23) and 4 x M8
Dome Nuts (6). Securely tighten all 4 Bolts.
1
Page 1
8
Содержание CYCLE-ATC-16/3
Страница 2: ......
Страница 22: ...Assembly Adjustments L Page 22...