background image

 

D400                                                      

      

                               

       5/5 

 

changed, it is extremely important to cycle the regulator a few times. As soon as the 2

nd

 stage 

stops leaking, screw the adjustment screw ¼ turn more for stability. Now adjust the lever play with 
the Allen key to obtain a total play of 3 mm at the tip of the lever. 
 
6. 

If the spring adjustment screw is completely screwed down and the 2

nd

 stage still leaks, 

close the tank valve, purge the regulator, unscrew the spring compression adjustment screw and 
reverse the friction disk to place the nipple in contact with the adjustment screw ( refer to 
paragraph 12 B). Reassemble according to paragraph  6. If the leak does not stop, disassemble 
the spring adjustment screw and change the poppet assembly and start again the complete 
adjustment procedure. If still unsuccessful with several new poppet assemblies, change the orifice 
(see paragraph 5 for assembly) and start again the complete adjustment procedure. 
 
7. 

Place the diaphragm as follows: Hook the lever into the lever linkage of the diaphragm. On 

the outer periphery of the diaphragm there are 4 injection moulding points, 2 of which are aligned 
with the lever linkage. To obtain the best performance, the lever should be at right angle to the 
lever linkage. We suggest aligning the 2 mentioned injection points with the parting line of the 2

nd

 

stage housing. Lift the exhaust with the screwdriver to confirm. 
 
8. 

Place the washer on the diaphragm then tighten moderately the diaphragm cover. 

 
9. 

Place back the rubber cover. 

 
10. 

 Assemble the o ring P/N 01.050.177 on the  cap and moderately tighten with the universal 

tool.    

Содержание SCUBAPRO D400 2nd STAGE

Страница 1: ...D400 1 1 MAINTENANCE PROCEDURE FOR D 400 2nd STAGE ...

Страница 2: ...he 3 32 ball Allen key partially unscrew the lever adjustment screw and remove the lever 7 With one finger push on the lever adjustment screw to remove the assembled poppet housing 8 Depending on the version remove the spring adjustment screw with the 3 mm Allen key or the small screw driver Remove the spring pad the spring and the poppet 9 Hold the central part of the shaft of the poppet assembly...

Страница 3: ...ppet assembly has been taken apart place the o ring P N 01 050 323 in the groove Place the seat taking care to place the smooth surface facing the o ring groove Assemble the o ring P N 01 050 363 on top of the seat then place the seat retainer and the nut Hold the middle part of the shaft of the poppet with the small pair of pliers and tighten the nut with the 5 mm socket wrench Do not over tighte...

Страница 4: ... the mouthpiece tube 16 The lever is not symmetrical and will not be in the axis of the poppet housing It is extremely important to position the lever as follows when the complete poppet housing is inserted the lever should not stick out of the diaphragm level If it is so slightly unscrew the lever adjustment screw with the 3 32 Allen key and remove the lever to insert it the opposite way Catch up...

Страница 5: ... poppet assembly and start again the complete adjustment procedure If still unsuccessful with several new poppet assemblies change the orifice see paragraph 5 for assembly and start again the complete adjustment procedure 7 Place the diaphragm as follows Hook the lever into the lever linkage of the diaphragm On the outer periphery of the diaphragm there are 4 injection moulding points 2 of which a...

Отзывы: