UVAIRx Ux 210 Series Скачать руководство пользователя страница 8

Ux210 INSTALLATION 

1. Find a suitable location to mount

your Induct Unit

2. If necessary, cut away insulation

for your plate to adhere to the
duct.

3. Using the Adhesive Gasket Plate,

trace the hole locations on the
duct.

4. Use the Hole Saw and Drill to cut out the marked holes.

Ux210 INSTALLATION (continued) 

4. Remove the plastic backing on

your Adhesive Gasket Plate.

5. Press the Adhesive Gasket Plate

onto the duct. Secure with the (8)
Self‐Tapping screws.

Note: For Fiberglass ducts, secure the Gasket Plate using 
the Toggle Bolt Anchors (not supplied) instead of Self‐
Tapping Screws 

6. Place the Unit and Cells through the

openings and secure with the (4)
Brass Thumb Nuts.

7. Plug the Unit Power Cable into the

receptacle of have a Licensed
Electrician or HVAC Installer to

Содержание Ux 210 Series

Страница 1: ...ck Colorado 80104 303 579 4865 www UVAIRx com Ux 210 Ux 520 Series Active Photocatalytic Oxidation PCO In Duct Technology USER S GUIDE CAUTION Read manual carefully for proper procedures and operation...

Страница 2: ...________________________________ 1 FURTHER LIMITATIONS AND EXCLUSIONS ARE AS FOLLOWS Any warranty that may be implied in connection with your purchase or use of the Product including any warranty of m...

Страница 3: ...our distributor for your new cell replacements PCO Cell Part Number CELL HV 14 03 GT 3 CHANGING THE PCO CELL continued 4 Exchange the Old PCO Cells with the New PCO Cells and replace the 4 Screws that...

Страница 4: ...stomer s purchase price OBTAINING WARRANTY SERVICE To obtain warranty service you must return the defective product along with proof of purchase to the UVAIRx Authorized Service Center All shipping co...

Страница 5: ...s destroy pollutants which include mold bacteria viruses odors and volatile organic compounds VOCs at their source in the air and on surfaces While these PCO oxidizers are very aggressive in destroyin...

Страница 6: ...openings measuring approximately 3 5 8 89cm each will need to be cut into the existing duct work to install the unit properly 5 MAINTENANCE UV LAMP INDICATOR Your UVAIRx unit requires no periodic main...

Страница 7: ...unded outlet Long term use of an extension cord is not recommended due to safety considerations HARDWARE REQUIREMENTS Permanent wiring of the unit into your HVAC system or installations using a 220V p...

Страница 8: ...0 INSTALLATION continued 4 Remove the plastic backing on your Adhesive Gasket Plate 5 Press the Adhesive Gasket Plate onto the duct Secure with the 8 Self Tapping screws Note For Fiberglass ducts secu...

Страница 9: ...hardwire the Unit directly into the HVAC system 8...

Отзывы: