UVAIRx Ux 210 Series Скачать руководство пользователя страница 7

Waste Management Center for proper disposal procedure. 

10 

ALTERNATIVE CUTTING METHOD 

1. Using the Adhesive Gasket Plate,

trace the hole locations onto the
duct.

2. Drill holes around the outside

edges of the previously marked
holes but inside the outer holes of
the Adhesive Gasket Plate.

3. Use the Tin Snips to cut out the space

around the marked holes.

9

 

ELECTRICAL REQUIREMENTS 

To use the 120V plug, be sure to locate the unit within 6ft. of a 
standard 120V grounded outlet. Long term use of an extension cord 
is not recommended due to safety considerations. 

HARDWARE REQUIREMENTS 

Permanent wiring of the unit into your HVAC 
system or installations using a 220V plug (not 
included) should be done by a licensed HVAC 
Installer or Electrical Contractor only. 

For 110V and 220V Applications:  Black = L1, 
White = Neutral, Green = Ground 
For International Applications:  Brown = L1, 
Blue = L2, Green / Yellow Stripe = Ground 

Ux510 INSTALLATION 

1. Hang the Ux510 from the ceiling using chain or hanger that

will support 39 pounds. Use holes in base of unit for
hanging.

2. Electrical requirements are: 120 VAC, 60 Hz or 220 VAC, 50

Hz

3. Airflow is 262 cfm.

Содержание Ux 210 Series

Страница 1: ...ck Colorado 80104 303 579 4865 www UVAIRx com Ux 210 Ux 520 Series Active Photocatalytic Oxidation PCO In Duct Technology USER S GUIDE CAUTION Read manual carefully for proper procedures and operation...

Страница 2: ...________________________________ 1 FURTHER LIMITATIONS AND EXCLUSIONS ARE AS FOLLOWS Any warranty that may be implied in connection with your purchase or use of the Product including any warranty of m...

Страница 3: ...our distributor for your new cell replacements PCO Cell Part Number CELL HV 14 03 GT 3 CHANGING THE PCO CELL continued 4 Exchange the Old PCO Cells with the New PCO Cells and replace the 4 Screws that...

Страница 4: ...stomer s purchase price OBTAINING WARRANTY SERVICE To obtain warranty service you must return the defective product along with proof of purchase to the UVAIRx Authorized Service Center All shipping co...

Страница 5: ...s destroy pollutants which include mold bacteria viruses odors and volatile organic compounds VOCs at their source in the air and on surfaces While these PCO oxidizers are very aggressive in destroyin...

Страница 6: ...openings measuring approximately 3 5 8 89cm each will need to be cut into the existing duct work to install the unit properly 5 MAINTENANCE UV LAMP INDICATOR Your UVAIRx unit requires no periodic main...

Страница 7: ...unded outlet Long term use of an extension cord is not recommended due to safety considerations HARDWARE REQUIREMENTS Permanent wiring of the unit into your HVAC system or installations using a 220V p...

Страница 8: ...0 INSTALLATION continued 4 Remove the plastic backing on your Adhesive Gasket Plate 5 Press the Adhesive Gasket Plate onto the duct Secure with the 8 Self Tapping screws Note For Fiberglass ducts secu...

Страница 9: ...hardwire the Unit directly into the HVAC system 8...

Отзывы: