Unfold the roof frame assembly by unfolding the roof
arches while leaving the ridge hinges resting on the ground
to limit the effort required to unfold.
Raise the roof frame upright so it is resting on the eaves.
Remove the frame bag and place it outside the cleared set-
up area.
4
Frame setting-up
SHELTER SETTING-UP
(minimum 4 persons by tent)
Position the frame bag in the middle of this area. Place the
longest length of the bag in the same direction as the desired
length of the tent when erected.
You will need a 10 x 8 m setting-up area.
Open the frame bag and remove the side arches with
integrated feet. Place 4 side arches on either side of the
cleared area about a distance of 3 meters from the center.