16 of 34
03103436-A10030 Rev. B
Plenum
Installation
1.
Insert the plenum studs through the holes in the cowl. Install (4) flat washers and nuts. Torque
the nuts to 25–29 lb•ft.
2. Connect the plenum harness to the evaporator assembly.
3. Connect the 2-1/2" duct hoses.