background image

23

2" MINIMUM
CLEARANCE

EXISTING OIL, 
ELECTRIC OR
GAS FURNACE

SOLID FUEL
FURNACE

INSTALLATION H

EXISTING OIL, 
ELECTRIC OR
GAS FURNACE

SOLID FUEL
FURNACE

(TOP VIEW)

(FRONT VIEW)

Содержание Hotblast 1500

Страница 1: ...E THE 1500 1537G HOTBLAST FUR NACES HAS BEEN APPROVED FOR U S INSTALLATIONS ONLY CERTIFIED UNDER ANSI UL 391 1983 85591R UNITED STATES STOVE COMPANY 227 Industrial Park Road P O Box 151 South Pittsburg TN 37380 423 837 2100 www USSTOVE com CAUTION READALLINSTRUCTIONSCARE FULLY BEFORE STARTING THE INSTALLATION OR OPERATING THE FURNACE IMPROPER INSTALLATION MAY VOID YOUR WARRANTY DO NOT USE THIS FUR...

Страница 2: ...encil 6 Foot Folding Rule or Tape Tin Snips Drill Hand or Electric Drill Bit 1 8 Dia For Sheet Metal Screws Screw Driver Blade Type Gloves Sabre Saw 5 16 Nut Driver or 5 16 Socket w Ratchet MATERIAL 6 Pipe 6 Elbow Collar and Thimble as required 24 gauge min 1 2 Sheet Metal Screws 6 Inside diameter Listed Residential Type or Building Heating Appliance Chimney or existing masonry chimney Electrical ...

Страница 3: ... inches w c DO NOT operate with fuel loading or ash removal doors open DO NOT store fuels paints thinners flammable liquids or other highly volatile substances in the furnace room CAUTION HOT SURFACES Keep children away Do not touch during operation _______________________CAUTION ________________________ INSPECT FLUE PIPES FLUE PIPE JOINTS AND FLUE PIPE SEALS REGULARLY TO ENSURE THAT SMOKE AND FLU...

Страница 4: ...ymarchPark Quincy MA02269 11 Keep the ashpit section free of excess ashes Do not allow ashes to stack higher than the sides of the ash pan 12 DISPOSAL OF ASHES Place ashes in a metal container with a tight fitting lid Keep the closed container on a noncombustible floor or on the ground well away from all combustible materials Keep the ashes in the closed container until all cinders have thoroughly...

Страница 5: ...RNACE INSTALLATION As a central furnace the unit functions indepen dently of any other system The blower will come on when the plenum temperature reaches the setting on the blower control PARALLEL INSTALLATION See Optional Wiring Diagram Page 13 Fig 13 The design is such that when the blower comes on the blower on the central system also comes on The blower will only come on when the temperature i...

Страница 6: ...ING FRESH COAL CAUTION DO NOT OPERATE WITH THE FEED AND OR ASH DOOR OPEN THIS FURNACE IS DE SIGNED FOR THERMOSTATIC OPERATION OPERATION WITH ANY OF THESE DOORS OPEN WILL OVERHEAT AND DAMAGE THE FURNACE CAUTION NEVER USE GASOLINE GASOLINE TYPE LANTERN FUEL KEROSENE CHARCOAL LIGHTER FLUID OR FLAMMABLE LIQUIDS TO START OR FRESHEN UP A FIRE IN THE FURNACE WARNING NEVER STORE FLAMMABLE LIQUIDS ES PECIA...

Страница 7: ... pipe to sidewall 21 530mm Chimney connector pipe to backwall 18 460mm Hot air ducts to combustibles 6 150mm Refer to Fig 2 3 Place the furnace on a noncombus tible floor Check figures 2 and 3 Be sure you have the clearances shown from the furnace and the connector pipe to combustible surfaces If you have a solid brick or stone wall behind your furnace you can place the furnace as close as you wis...

Страница 8: ...alified mason or chimney dealer The installation must conform to local fire codes and N F P A 211 DO NOT CONNECT THIS FURNACE TO A CHIMNEY FLUE SERVING ANOTHER APPLI ANCE The chimney used for a furnace must not be used to ventilate the cellar or basement If there is a cleanout opening at the base of the chimney close it tightly Fig 5 LISTED FACTORY BUILT CHIMNEY Carefully follow chimney manufactur...

Страница 9: ...include a section for a barometric draft regulator between the furnace and the chimney Fig 4 5 7 The barometric draft regulator must be installed in the same room same pressure zone as the furnace 8 Install the barometric draft regulator strictly in accordance with the instructions that are provided with the barometric draft regulator 9 A solid damper must be used in the chimney connecting pipes b...

Страница 10: ...te Slotted holes are for adjustment of handle Adjust handle until some pres sure is required to lock feed door during firing sequence Install the thermodisc on rear of furnace cabinet with the two screws provided Mounttheconduitassemblyfromthejunc tion box to the thermostat bracket Crimp the two female terminals to each of the wire leads Plug the wires to the thermodisc NOTE It does not matter whi...

Страница 11: ...11 Fig 11 NOTE Wire leads from the distribution blower are usually BOTH BLACK Makes no difference which leads from the motors connects to the corre sponding leads coming out of the conduit ...

Страница 12: ...ou must direct heated air from 8 outlets away from the furnace or it will not function properly 1 This installation must be done by a qualified heating equipment installer 2 The installation is to be done in compliance with NationalFireProtectionAssociationinstallationstan dards No 89M 90B 211 70 National Electrical Code andUniformMechanicalCode913 6 4 inthe states where applicable Their code offe...

Страница 13: ...ll give more complete combustion and less build up of tars or soot in the chimney Set thermostat to HIGH before opening feed door Wood fire Add wood to a convenient level Coal Fire Never smother the fire when adding coal See Caution Gas accumulation and a mild smoky explosion will occur Add fresh kindling if the bed of coals has cooled Add up to 20 lbs of coal per loading Never add coal above the ...

Страница 14: ...age 24 for list of trouble shooting tips 5 6 A draft reading of 05 to 06 w c is suggested for proper burning of this unit when using wood or bituminous coal as fuel When using anthracite coal this draft reading is a minimum reading Chimney Maintenance Creosote and Soot Formation and Need for Removal When wood is burned slowly it produces tar and other organic vapors which combine with expelled moi...

Страница 15: ...15 26 27 28 29 30 31 32 33 34 35 36 37 Model 1500 1537G Repair parts ...

Страница 16: ...18 23859B Draft Cap Painted 1 19 89354 Ash Door Handle 1 891098 Ash Door Handle 1 20 89574 Spring Handle 1 21 Handle Bushing Included with Handle 1 22 23445 Door Latch 1 23 83461 Handle Washer 1 24 83178 3 8 16 Jamb Nut 1 25 22662 Feed Door Hinge Bracket 1 26 89308 Feed Door Handle Assembly 1 891097 Feed Door Handle Assembly 1 27 89574 Spring Handle 1 28 89319 Blower Gasket 2 29 80230 Blower Assem...

Страница 17: ...4 23431 Friction Plate 1 5 81903 Thermostat 1 6 23427 Thermostat Mounting Bracket 1 7 83172 10 Sheet Metal Screw 6 8 89041 Spring 1 9 89175 Thermostat Knob 1 10 23425 Handle Bracket 2 11 89520 Wooden Handle 1 12 86318 Thermostat Chain 542 FT 13 68217 Feed Door Assembly Includes Door and Gasket 1 N S 83106S Machine Screw 10 24 x 1 2 SL HD Z 2 N S 83136 Washer 9 32 I D 5 8 O D 1 16 THK 1 N S 83816 C...

Страница 18: ...18 ...

Страница 19: ...19 COLD AIR RETURN TO EXISTING DUCT WORK WARM AIR EXISTING FURNACE SOLID FUEL FURNACE FILTER BOX APPENDIX INSTALLATION A ...

Страница 20: ...D AIR RETURN TO EXISTING DUCT WORK WARM AIR EXISTING FURNACE SOLID FUEL FURNACE FILTER BOX PLENUM COLLECTOR BOX COLD AIR RETURN TO EXISTING DUCT WORK WARM AIR EXISTING FURNACE SOLID FUEL FURNACE FILTER BOX PLENUM ELBOW PLENUM TOP OPTIONAL ...

Страница 21: ...21 ...

Страница 22: ...ANCE DUCT WORK FURNACE PLENUM EXISTING FURNACE SOLID FUEL FURNACE COLD AIR RETURN INSTALLATION F 2 MINIMUM CLEARANCE DUCT WORK SOLID FUEL FURNACE INSTALLATION G COLD AIR RETURN TO FILTER BOX CENTRAL FURNACE INSTALLATION ...

Страница 23: ...23 2 MINIMUM CLEARANCE EXISTING OIL ELECTRIC OR GAS FURNACE SOLID FUEL FURNACE INSTALLATION H EXISTING OIL ELECTRIC OR GAS FURNACE SOLID FUEL FURNACE TOP VIEW FRONT VIEW ...

Страница 24: ... properly furnace and this unit 5 Air from Registers is not hot BadblowerThermodisc ReplaceblowerThermodisc 6 Smoke and or odor from Oil from furnace and duct The metal used in constuc registerswhenfurnace work tion of the furnace and duct is used for first time work has a light coating of oil This should disappear after a short period of time Once this burnoff has occur red it should not reoccur ...

Отзывы: