![USFilter DEPOLOX 3 PLUS Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/usfilter/depolox-3-plus/depolox-3-plus_manual_1064125022.webp)
IM 50.560CA UA (B/4-03)
DEPOLOX
®
3
PLUS
RESIDUAL ANALYZER
12
2.1.8 Start-Up
WARNING: THE DEPOLOX 3
PLUS
MODULE HAS NO POWER
SWITCH OF ITS OWN AND IS IN OPERATION AS SOON AS
THERE IS A CONNECTION TO THE POWER SUPPLY. CON-
NECTED DEVICES HAVE TO BE SWITCHED OFF DURING IN-
PUT OF OPERATING DATA IN ORDER TO PREVENT UNCON-
TROLLED START-UP OR MALFUNCTIONS. ONLY WHEN THE
OPERATING DATA IS INPUT AND CHECKED MAY OTHER
DEVICES BE SWITCHED ON.
Start-up can only be effected after correct installation of the sample water
line, leak test, and electrical connection to the systems.
Start operation of the measuring cell (refer to paragraph 3.3.1, Start-Up
of the Measuring Cell, or to paragraph 2.3, Membrane Sensor.
Check that the setting of the 10-position DIP switch, S3, “Chlorine Cell”
(refer to paragraph 2.1.4, Select the Chlorine Cell) is correct. Start by
switching on the mains power to the control module.
First, the program version is displayed, for example:
AAB1603
FRG 49
V:X_XX/XX
Free Chlorine
Continue as follows (refer to Section 3 - Operation, as necessary):
a. Select the bus address in the SETUP menu (if operated in a bus sys-
tem)
b. Select measuring range in the SETUP menu.
c. Select disinfectant.
d. Select pH or Fluoride mode (optional, SETUP)
e. Set the alarm values and functions in the ‘alarm’ menu(s).
f. Switch on the external units
g. After about 24 hours of running time, a calibration must be carried
out. Until then the measured values are only approximate.
!
Содержание DEPOLOX 3 PLUS
Страница 10: ...IM 50 560CA UA B 4 03 DEPOLOX 3 PLUS RESIDUAL ANALYZER...
Страница 16: ...IM 50 560CA UA B 4 03 DEPOLOX 3 PLUS RESIDUAL ANALYZER 6...
Страница 84: ...IM 50 560CA UA B 4 03 DEPOLOX 3 PLUS RESIDUAL ANALYZER 74...
Страница 98: ...IM 50 560CA UA B 4 03 DEPOLOX 3 PLUS RESIDUAL ANALYZER 88...