USA Lab RE-200AA Скачать руководство пользователя страница 8

6 Water and vacuum tubing connections                                                                                        

 

 

 
 
7 Operation                                                                                                                                         

 

 

7.1 Operating method 
 

Set your chiller for the rated lowest temperature. Always run the loop. Allow the chiller to cool the entire loop 
until it is close to the set temperature. Raise the bath until the water covers half of the outside of the flask. 
Turn on the bath heating and set between 50C 

– 75C. Turn on the rotation for as fast as possible, while 

stable. If the glass wiggles, slow the rotation down. Place the cover over the boiling flask onto the edges of 
the bath. The vacuum should be started. Add a tube that runs from the feed port down to your vessel. Start 
the run when the chiller reaches 29C, when set for 30C. Open the feed port to begin filling the boiling flask. 
Do not fill the flask more than half-way. The evaporation will begin at this point. Evaporation can be boosted 
with pre heated solution. 40-45C. It will be necessary to refill the boiling flask over time. When the receiving 
flask is full. Turn off the vacuum and vent the vacuum in the system. Empty the receiving flask. Then close 
any valves used to vent the vacuum. Turn the vacuum on again and continue to evaporate.  
 

7.2 Storage 
 

For long periods, please shut off the power switch and disconnect the power. Empty the water bath, boiling 
flask, receiving flask and condenser coil(s) Allowing time to dry completely. Cover while in storage. 

 

 

8 Maintenance                                                                                                                                 

     

 

 

1. Please shut off the power switch and disconnect the power cord before any maintenance. 
2. Please use damp soft cloth to wipe clean. Stubborn stains should be cleaned by neutral detergents. 
3. The maintenance of internal electrical and heating parts must be performed by professionals or trained 
electricians. 
4. Do not directly splash water over the product or use abrasive powder, diluent, oil, kerosene, acidic 
material and similar substances during cleaning, or else shock or other accidents will occur. 
 
 

Содержание RE-200AA

Страница 1: ...Rotary Evaporator Manual Model RE 200AA 2L Rotary Evaporator Automatic Lift...

Страница 2: ...maintaining USA Lab equipment should be familiar with its operation and should be thoroughly trained and instructed on safety Most accidents are preventable through safety awareness Training It is the...

Страница 3: ...erson to trip or fall toward an operating machine Keep fingers hands or any part of the body out of the machine and away from moving parts when the machine is operating Any machine with moving parts a...

Страница 4: ...ge diameter rotary evaporating flasks When it is placed in a water bath it allows the solution to spread and evaporate rapidly What s more the product may be fitted with a multi purpose water circulat...

Страница 5: ...5 2 Diagram...

Страница 6: ...n arrows until the Set Value is reached You can use the left arrow for large changes Press SET again to finalize the changes Speed To set the RPM of the motor simply turn the motor speed adjustment kn...

Страница 7: ...able Insert the vapor duct glass cylinder into the center of the motor Insert the glass condenser in left flange of motor head and tighten the collar Do not over tighten Put the feed valve into conden...

Страница 8: ...with pre heated solution 40 45C It will be necessary to refill the boiling flask over time When the receiving flask is full Turn off the vacuum and vent the vacuum in the system Empty the receiving f...

Страница 9: ...returns for customized items When purchasing a customized item you agree that there are no returns due to the nature of the item s being specific to your needs By default a 15 restocking fee is appli...

Отзывы: