28
Component
Action
Frequency
Replacement
Part #
Existing Well Pressure
Tank
Drain tank until the water runs
clear.
1
-
6 Months
N/A
Injection Panel Pump
Tube
Inspect pump tube and replace
as needed. F Tube.
1
-
5 Years
411
-
EC30F
-
2
Injection Panel Injection
Fitting
Remove the injection fitting and
clean off build up.
1
-
6 Months
411
-
UCDBINJ
Injection Panel Duck
Bill Check Valve
Replace injection check valve
as needed.
1
-
5 Years
411
-
UCCVDBO
Chlorine Solution Tank
Periodically check the solution
level and refill as needed.
Varies by wa-
ter usage and
quality
710
-
PELLETS
Retention Tank(s)
Blow down retention tanks peri-
odically to remove sludge from
contaminant build up.
Varies by wa-
ter usage and
quality.
N/A
Carbon Tank
Check the clock and settings
periodically or after a power out-
age.
4 Months
N/A
Carbon Tank
Periodically check the water af-
ter the carbon tank to ensure
the chlorine is being removed.
When chlorine is detected, re-
place the carbon in the tank.
3
-
5 Years
Typically
600
-
GCS
-
1240
Maintenance Schedule
Содержание Matrixx 150-FLCS Series
Страница 10: ...10 Retention Tank Installation ...
Страница 29: ...29 Flow Schematic ...