![US Water Systems GreenWave 1000 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/us-water-systems/greenwave-1000/greenwave-1000_installation-operation-and-maintenance-manual_1063819007.webp)
Installation
1. Place the GreenWave tank in the desired location.
2. Attach the mounting bracket to the pre-filter using the
included screws and tighten.
3. Securely mount the pre-filter on the wall making sure
to properly anchor the filter.
4. Connect the Cold Water supply to the inlet of the pre-
filter.
5. Connect the outlet of the pre-filter to the inlet of the
GreenWave tank.
NOTE: The GreenWave system operates in the
UPFLOW mode which is opposite of a conventional
softener.
6. Place a bucket under the outlet port or run a line from
the outlet port to a drain.
7. Slowly open the supply valve (user supplied) to the
GreenWave system. Allow the tank to fill with water.
Close the supply valve when a steady stream of water
comes out of the outlet port.
8. Connect the Outlet of the GreenWave system to the
cold water supply to the home.
9. Open the supply valve to the GreenWave system.
10. Open faucets downstream from the GreenWave system
to relieve any trapped air.
11. Check for leaks. Repair as needed.
12. The system is now ready, for service.
Bypass Valve Modification
Service Position
down-flow tank
As shipped, the bypass is set-up for down-
flow use. The arrow shape of the handles
points in the wrong direction for UP-flow use.
To convert it to UP-flow use, pull up on the
red handles until they come off. Rotate the
handle 180° and put it back on the valve stem.
Service Position
UP-flow tank
Bypass Position
UP-flow tank
Installation, Operation and Maintenance Manual
GreenWave System