System start-up 

 

 

Prior to start-up 

1.  Check all connections to be sure they are secure. 
2.  Turn  on  feed  water  valve  and  check  for  leaks.  (Turn  off 

and correct leaks if leaks occur.) 

3.  Close  the  valve  (the  tank  should  be  closed  from  the 

previous step) on storage tank and open the faucet until a 
steady stream of water flows.  Water will be flowing to the 
drain as well.  This may take several minutes.   

4. 

Once there is a steady stream of water coming from the 
faucet  (about  1/8”  in  diameter)  close  the  faucet  and  wait 
five minutes to see if any leaks result on the entire system 
(The initial water from the system may be discolored.  This 
is normal).  

 

 
NOTE: BE PATIENT!  It is very important that there is a steady 
stream  (not  drips)  of  water  coming  from  the  distribution  valve 
before  it  is  closed.    If  not,  there  could  be  air  trapped  in  the 
system and it will not fill the tank properly.  This can waste a lot 
of water.   

 
5.  If there are no leaks, open the storage tank valve allow the 

system to fill.  Most systems will be full within 2 hours.  The 
system is full when the water to the drain stops.  Check for 
leaks with the system full and repair them accordingly.   

 

 

Flushing system and checking operation 

To make sure RO system is operating correctly, follow these 
simple procedures: 
1.  Open faucet and allow tank to completely drain (water will 

be discolored). 

2.  Close faucet and re-fill the system. 
3.  Allow system to process water for approximately 2-3 

hours, at which point tank will be practically full. 

4.  Open faucet again and allow tank to empty for a second 

time.  Do not use this water. 

5. 

Wait another 2-3 hours to allow tank to re-fill. 

 

 

Air Purging 

 
If the tank doesn’t fill, the tank tubing may have air in it.  
Typically the standard startup procedure will be sufficient but in 
some cases due to the water temperature and pressure, 
additional air bleeding must be performed.  The following 
procedure will help bleed air from the system.   
 

1.  Close the tank valve and the feed water valve and open 

the distribution valve to relieve the pressure on the 
system. 

2.  Remove the tank tubing from the tank valve and hold it 

over a bucket or pan. 

3.  Open the feed water valve and the distribution valve. 
4.  Allow the system to run until there is a stream of water 

coming from the tank tubing. 

5.  Once there is a steady stream coming from the tank 

tubing, push it back into the tank valve.  BE SURE to push 
it in the tank valve completely or a leak could occur. 

6.  Allow the system to continue to operate until there is a 

steady stream coming from the distribution valve. 

7.  Once there is a steady stream coming from the faucet, 

close the distribution valve and open the tank valve.  Then 
go to the aforementioned flushing procedure. 

 
Once the system has been purged of air and is fully 
operational, install the DI cartridges in the housings. 
 
1.  Shut off the water supply valve and the tank valve.  Open 

the faucet and allow the pressure to release 

2.  Remove the DI filter sumps and install the DI cartridges.   
 

BE SURE to remove the plastic wrapper from the 
cartridges and make sure the upper rubber washer is in 
place. 
 

3.  Install the cartridges in the housings and make sure the 

sump O-ring and rubber washer is in place on the 
cartridge.   

4.  Install the sumps and tighten hand tight.  Snug them an 

additional 1/4 turn. 

5.  Turn on the supply water valve and the tank valve and 

allow the system to fill. 

6.  Flush the DI filters until the water quality stabilizes. 
 

NOTE: Water that sits in the DI sumps will start to lose 
quality.  The DI filters should be flushed for 3-5 minutes or 
until the quality stabilizes each time the system is used.  
This is normal for DI water systems.  

 

Содержание 200-SENTRY-IX

Страница 1: ...STEM Visit us online at www uswatersystems com REVISION 1 0 REVISION DATE June 6 2018 US Water Systems Corporate Office 1209 Country Club Road Indianapolis IN 46234 1 800 608 8792 info uswatersystems...

Страница 2: ...STOP TANK VALVE TUBING Parts Check List RO Module DI Module UV and Monitor Tubing Bundle Filter Wrench Drain Saddle Tank Valve Angle Stop Feed Valve Tank and Side Mount Tank Stand Pre and Post Filters...

Страница 3: ...d pre filters and membranes A BRACKET is provided so they may be mounted typically below sink There is a dual filter housing systems which holds the DI filters cartridges DI Filter Housings are used t...

Страница 4: ...unit where temperatures fall below freezing otherwise damage will result Guidelines for component placement are as follows STORAGE TANK may be placed where it is convenient within five feet of the RO...

Страница 5: ...Proceed with mounting the faucet FEED WATER CONNECTION is accomplished with an angle stop feed water valve This valve will be installed in the cold water line between the sink cold water shutoff valve...

Страница 6: ...tened 2 Once the faucet is secure install the 7 16 UNS x 3 8 QC faucet connector on the threaded nipple This fitting doesn t require sealant This fitting will seal at the beveled surface Tighten the f...

Страница 7: ...ter that is spilled Now install the angle stop valve on the sink faucet shutoff valve and tighten it Don t worry about the angle stop valve position because it will swivel and can be positioned later...

Страница 8: ...is recommended Install rubber gasket on this half of the drain saddle Be sure the gasket hole is lined up with the port hole 2 Drill 1 4 hole at mark through one side of pipe BE CAREFUL not to drill t...

Страница 9: ...tallation NOTE Tanks are pre pressurized at 7 psi Prior to installation check add or release as required E RO Filters and Membrane Installation 1 Install the sediment filter in the first sump When fac...

Страница 10: ...hten the center sump hand tight and secure it with the supplied filter wrench by turning it an additional 1 4 1 2 turn 6 Remove the far left sump and install the chloramine filter not pictured yellow...

Страница 11: ...ing with little effort Refer to connections instructions on Page 16 2 Use the supplied wrench to remove the membrane housing cap 3 Remove the membrane from the protective packaging and install it in t...

Страница 12: ...ng screws and install screws allowing the mounting bracket slots to slip over them NOTE If the cabinet sidewalls are not solid unit may sit on the floor with screws to keep it against the cabinet in a...

Страница 13: ...ply valve to RO unit at the sediment filter inlet fitting 4 Connect the tubing from the drain saddle to the RO unit at the flow restrictor on the membrane 5 Mount the DI system to the wall Attach the...

Страница 14: ...e air in it Typically the standard startup procedure will be sufficient but in some cases due to the water temperature and pressure additional air bleeding must be performed The following procedure wi...

Страница 15: ...amber BE SURE not to touch the UV bulb glass Wear rubber gloves if possible 2 Install the plug on the UV light bulb Make sure it is fully attached and push the UV light bulb into the chamber 3 Push th...

Страница 16: ...ite fiber type filter is installed in the INLET sediment filter sump Lubricate the o ring at the top of the sump with a small amount of the silicone included Tighten the filter sump hand tight then us...

Страница 17: ...d time At this point supply line to ice maker connection optional may be opened Once the system has been purged of air and is fully operational install the DI cartridges in the housings 1 Shut off the...

Страница 18: ...as measured in gallons per day gpd or milliliters per minute ml min Using a graduated cylinder the formulas are REJECT RATIO The reject ratio is the amount of water produced compared to the amount of...

Страница 19: ...ly into the tube stop 3 Push up to the tube stop Push the tube into the fitting to the tube stop The collet gripper has stainless steel teeth which hold the tube firmly in position while the O ring pr...

Страница 20: ...Installation Instructions 200 SENTRY IX Water Treatment System Page 20 Green Tube...

Страница 21: ...Installation Instructions 200 SENTRY IX Water Treatment System Page 21...

Страница 22: ...Installation Instructions 200 SENTRY IX Water Treatment System Page 22...

Страница 23: ...Installation Instructions 200 SENTRY IX Water Treatment System Page 23...

Страница 24: ...mage to the membrane or filters caused by iron sulfur bacterial iron silt sand tannins organics bacteria hot water or chlorine voids the warranty on the membrane These warranties are in lieu of all ot...

Отзывы: