Installation Instructions
Montageanleitung
CREW
120 cm GR1200-10
Glass fibre reinforced plastic (GFP) | glasfaserverstärkter Kunststoff (GFK) | horizontal/vertical | horizontal/vertikal
EN
1.
Mark holes for fittings No. (8) and install them.
2.
Hold the urinal against the wall and press firmly onto the
fittings No. (8) and the waste pipe.
3.
Adjust fitting no. (14), mark holes, drill holes and
mount fitting no. (14).
Please note that fitting no. (14) only has to be
mounted with a horizontal connection!
4.
Install screen Pos.(C) by using the included screws.
5.
Fill the waste trap Pos. (B) full with water.
6.
Insert the stainless steel cover Pos. (A).
7.
Pour 1 bottle uriLOCK ( 0,3 liter) over the cover.
8.
Seal the gap between the wall and the urinal with
silicone.
The uridan urinal is now ready for use!
Please leave customer care booklet, cleaning and
maintenance instructions and suction device with customer.
DE
1.
Löcher für Beschläge Nr. (8) bohren und montieren.
2.
Rinne an die Wand halten und fest auf Beschläge Nr. (8)
und Abflussrohr drücken.
3.
Beschlag Nr. (14) anpassen, Bohrungen anreißen, Löcher
bohren und Beschlag Nr. (14) montieren.
Bitte beachten Sie, dass Beschlag Nr. (14) nur bei einem
horizontalem Anschluss montiert werden muss!
4.
Abdeckung Pos.(C) mit beigelegten Schrauben montieren.
5.
Geruchsverschluss Pos. (B) mit Wasser auffüllen
6.
Deckel Pos. (A) einsetzen.
7.
Eine 0,3 l Flasche uriLOCK einfüllen.
8.
Fuge zwischen Wand und Rinne mit Silikon abdichten.
Ihr uridan-Urinal ist nun funktionsbereit!
Übergeben Sie bitte dem Kunden die im Verpackungskarton
beiliegende Reinigungs- und Wartungsvorschrift sowie den
beiligenden Saugnapf, und weisen Sie das Reinigungspersonal
anhand dieser Unterlagen ein.