4.2
Introduction
This part is suitable for EMS firmware-version 1.01.67 and above.
For firmware updating please contact with URE aftersales team.
4.2.1
Main
Figure 46 Main Interface
Main displays the inverter working status
and information, including:
•
Power: Total PV power
•
Total: Total power generation.
•
Battery: Current remaining battery
power (SOC).
•
Normal: Current working state of the
equipment, including Standby.
Figure 47 Main Menu
In the Main interface, press ENT key to
enter the Menu main interface.
Through the up and down key, select the
sub-menu, press the ENT key to enter the
select sub-menu, press Return key to
return to the previous layer.
4.2.2
Status
Figure 48 Status Menu
Status menu contains five sub-menus:
Solar, Battery, Grid, UPS and Comm
display the relevant information about the
current
physical
or
communication
interface respectively.
Figure 49 Grid Interface
Grid interface displays the real-time
information on the city electric side:
voltage U, current I, frequency F, P
Inv
,
P
MeterAC
, P
MeterDC
.