![URE MA1-INV Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/ure/ma1-inv/ma1-inv_installation-manual_1062066034.webp)
___________________________________________________________________
United Renewable Energy Co., Ltd.
Page 33 of 45
Step 4
:
Turn off the GRID switch incl. external AC circuit breaker.
Step 5
:
If backup load is applied, turn off the Backup switch.
Step 6
:
Turn off the PV switch on the cable box and the external DC
breaker.
Step 7
:
Close the inner cover and outer shell of Cable box.
More information can be found in MA1-BAT user manual.