background image

 

Step 6 – Adjusting and Anchoring Patio Cover 

Adjust the Patio Cover to the desired pitch and secure 
the  two  sections  of  each  post  in  the  front  and  back 
with  #10  x  1/2”  TEK  Screws.  After  the  posts  are 
vertically  leveled,  mark  their  location.  Move  the  post 
off the spot to allow location of an anchor. 
 
Concrete Anchor 
Keep  holes  at  least  2”  in  from  the  edge  of  the 
concrete to prevent cracking. Drill a 1/4” hole at least 
2” deep in concrete. Put a nut and washer on the stud 
flush with the end of the threads. Insert the stud in the 
hole and tap so the nut and washer are flush with the 
concrete. Tighten the nut about 4 turns to expand the 
base  of  the  stud.  Remove  the  nut  and  washer  from 
the Rawl-Stud and place a post bracket over the stud. 
Replace  the  washer  and  nut  and  tighten.  Place  the 
post over the bracket  and secure with a 1/4” x 1-3/4” 
bolt and nut. 
 
Wood Lag 
Drill  1/8”  hole  in  wood.  Place  post  bracket  over  hole  and  screw  wood  lag  into  hole  to  start  threads. 
Continue post attachment. 
 
Ground Anchor 
Drive the ground anchor into the ground until the slotted hole meets the ground. Insert the locking pin 
about 3” through this hole. Continue to drive the pin anchor until the second hole is at proper height 
for mounting posts. Drive the locking pin through the anchor until it is flush with the ground. 
 
Scroll Post 
Attach the base of the scroll post to the concrete with a 1/4” x 5/8” anchor and nut. 
 

Step 7 – Gutter 

Secure the gutter to the end of the panels with #10 x ½” hex head screws every 6”. Attach the gutter 
strap to the gutter and secure it to the top of the overlapped ribs with #10 x ½” hex head screws. By 
pulling the gutter strap back further on the rib of the panel than the proceeding strap it is possible to 
create limited water flow in the gutters. If this is attempted, the water should be directed towards the 
downspouts. Downspouts may  be installed  anywhere in the  gutter  sections. It is recommended that 
the joiner have sealant applied prior to inserting the gutter into the joint. (See Fig. R) 
 
The right end of the Gutter should be even with the inside leg of the right rib of the right end Awning 
Panel.  This  will  allow  the  rib  to  extend  beyond  the  Gutter  on  both  ends  of  the  Awning.  Install  the 
remaining  section  of  Gutter  in  the  same  fashion,  butting  the  Gutter  Sections  and  connecting  with  a 
Gutter  Joiner.  Make  sure  that  all  joints  are  caulked  and  water  tight.  Should  a  leak  develop  after 
installation, Peel and Seal may be applied inside the gutter. 

 

Содержание Arched

Страница 1: ...de when facing the home In general we will begin assembling the Awning from the right to the left The normal slope per foot of projection for the Awning is 1 1 2 or greater The minimum slope is 1 1 3 per foot of projection Anything less than 1 1 3 may cause water to flow toward the home Clearance above a door should be a minimum of 6 to assure that the Awning will not interfere with the opening of...

Страница 2: ... Awning the Support Channel is to be located Measure that distance on the drilling template and drill a 5 32 hole on the scored line The minimum set back is 6 and the maximum is 16 Place the drilling template on the end of the panel with the clip end pointing downward and slide it flush against the inside of the panel rib on the right side The predrilled hole closest to the clip end of the templat...

Страница 3: ...Secure with 10 x 1 2 TEK Screws through the front and back of the Support Channel and into the small section of the Post Space the remaining posts equally between the end posts and secure to the Support Channel If a post is spaced where a Support Channel Joiner is located the post must be moved right or left to be installed Step 5 Awning Panel Assembly All Awning Panels are alike Stand up the Supp...

Страница 4: ...e splash block into the Mounting Rail between the two ribs on the first Awning Panel The splash blocks have a tight secure fit and by tilting them forward while inserting will ease the process Install the remaining Awning Panels and splash blocks in the same fashion by aligning the pre punched holes in the Mounting Rail with the Awning Panel ribs The last Awning Panel should be secure just as the ...

Страница 5: ... Continue to drive the pin anchor until the second hole is at proper height for mounting posts Drive the locking pin through the anchor until it is flush with the ground Scroll Post Attach the base of the scroll post to the concrete with a 1 4 x 5 8 anchor and nut Step 7 Gutter Secure the gutter to the end of the panels with 10 x hex head screws every 6 Attach the gutter strap to the gutter and se...

Страница 6: ...Gutter with 8 x 3 4 Screws Attach the Trim Brace to the inside of the rib in the Valance with 8 x 3 4 Screws Run the screw through the valance and into the Brace for a strong hold Align the Valance vertically and drill through the top hole in the Trim Brace up through the Awning Panel Secure top of Trim Brace with 10 x 3 4 Screws installed through the Awning Panel into the Trim Brace Install Awnin...

Страница 7: ...sired location and then cut a hole within the area outlined by the Downspout Adapter Three Downspout Elbows are provided to allow the downspouts to be set back and to provide a kick out at the bottom The 7 downspout may be cut if the set back distance is greater than the distance of the two elbows Secure each section with 8 x 3 4 screws Each downspout section should be secured with the downspout s...

Отзывы: