CHANNEL  JOINER  IS  AGAINST  THE  INSIDE  LEGS  OF  THE  SUPPORT  CHANNEL  AND  THAT 
THE TWO SECTIONS THAT BUTT TOGETHER ARE EVEN. 

 

 

Step 4 – Post Assembly 

Determine  the  desired  height  of  the  posts. 
Normal slope is about 1-1/2” of slope per foot of 
projection. Insert the 30” section of the Post into 
the 84” section for form a Standard Telescoping 
Post. Where  the  sections  join  together,  attach  a 
vise grip or clamp to the smaller section. This will 
prevent  the  smaller  section  from  sliding  further 
into  the  large  section.  Assemble  all  posts  in  a 
similar fashion.  
 
Position  the  end  posts  6  –  12  inches  in  from 
each  end  of  the  Support  Channel.  Insert  the 
small  1-1/4”  sections  of  the  Posts  into  the 
Support Channel until it stops. Secure with #10 x 
1/2”  TEK  Screws  through  the  front  and  back  of 
the  Support  Channel  and  into  the  small  section 
of  the  Post.  Space  the  remaining  posts  equally  between  the  end  posts  and  secure  to  the  Support 
Channel. If a post is spaced where a Support Channel Joiner is located, the post must be moved right 
or left to be installed.  
 

Step 5 – Awning Panel Assembly 

All  Awning  Panels  are  alike.  Stand  up  the  Support  Channel  by 
staggering  the  attached  posts.  The  assembly  of  the  Awning 
Panels must begin from the right side of the Mounting Rail. Insert 
the  boxed  end  of  the  first  Awning  Panel  into  the  Mounting  Rail 
with the overlapping rib extending beyond the end of the Mounting 
Rail.  The  first  panel  may  be  secured  in  one  of  two  places:  1) 
through  the  back  of  the  boxed  end  of  the  panel  and  into  the 
Mounting Rail, or 2) through the bottom of the Mounting Rail and 
into the panel surface. Use a #10 x 3/4” Hex Head Screw. 
 
 

Содержание Arched

Страница 1: ...de when facing the home In general we will begin assembling the Awning from the right to the left The normal slope per foot of projection for the Awning is 1 1 2 or greater The minimum slope is 1 1 3 per foot of projection Anything less than 1 1 3 may cause water to flow toward the home Clearance above a door should be a minimum of 6 to assure that the Awning will not interfere with the opening of...

Страница 2: ... Awning the Support Channel is to be located Measure that distance on the drilling template and drill a 5 32 hole on the scored line The minimum set back is 6 and the maximum is 16 Place the drilling template on the end of the panel with the clip end pointing downward and slide it flush against the inside of the panel rib on the right side The predrilled hole closest to the clip end of the templat...

Страница 3: ...Secure with 10 x 1 2 TEK Screws through the front and back of the Support Channel and into the small section of the Post Space the remaining posts equally between the end posts and secure to the Support Channel If a post is spaced where a Support Channel Joiner is located the post must be moved right or left to be installed Step 5 Awning Panel Assembly All Awning Panels are alike Stand up the Supp...

Страница 4: ...e splash block into the Mounting Rail between the two ribs on the first Awning Panel The splash blocks have a tight secure fit and by tilting them forward while inserting will ease the process Install the remaining Awning Panels and splash blocks in the same fashion by aligning the pre punched holes in the Mounting Rail with the Awning Panel ribs The last Awning Panel should be secure just as the ...

Страница 5: ... Continue to drive the pin anchor until the second hole is at proper height for mounting posts Drive the locking pin through the anchor until it is flush with the ground Scroll Post Attach the base of the scroll post to the concrete with a 1 4 x 5 8 anchor and nut Step 7 Gutter Secure the gutter to the end of the panels with 10 x hex head screws every 6 Attach the gutter strap to the gutter and se...

Страница 6: ...Gutter with 8 x 3 4 Screws Attach the Trim Brace to the inside of the rib in the Valance with 8 x 3 4 Screws Run the screw through the valance and into the Brace for a strong hold Align the Valance vertically and drill through the top hole in the Trim Brace up through the Awning Panel Secure top of Trim Brace with 10 x 3 4 Screws installed through the Awning Panel into the Trim Brace Install Awnin...

Страница 7: ...sired location and then cut a hole within the area outlined by the Downspout Adapter Three Downspout Elbows are provided to allow the downspouts to be set back and to provide a kick out at the bottom The 7 downspout may be cut if the set back distance is greater than the distance of the two elbows Secure each section with 8 x 3 4 screws Each downspout section should be secured with the downspout s...

Отзывы: