Step
08
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ta
nd
-U
p
C
oo
p
V2
M
ar
ch
4
, 2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
R
oo
st
B
ar
s
Fig 8
8.1 Install Roost Bars:
Roost panels are hidden so that
you can see locations of roost bars. Using a helper
behind the coop, position
B1
Roost Bars in locations
shown in
Fig 8 and
using
E1
Brown Screws on front and
back panels, drive screws into center of bars fixing them
into position.
8.2 Day Roost:
Carefully hand tap B5 Day Roost bard
into position as shown in
Fig 8.
For easy cleaning, it is not
screwed in.
8.3 Storage Door & Main Door Hooks:
As noted in
Fig 8
attach storage door
H3
Eye in pre-drilled hole on storage
door (standard position) and using the provided
G4
1/8
inch drill bit, make a pilot hole on the roof beam directly
above and install the hook part to your liking.
If you prefer a lower hook point, the hoof portion of the H#
eye can be installed along the storage doors edge and
hooked into the wire on the side panels.
Main Door Hook:
With other hook and eye, install on the
inside of the main door so that you can lock the door
behind you if needed. Works best with the hook on the
door and the eye in the side panel.
:-) Need that helper again!
Cut-Away View of Roost
B5 Day Roost Bar
B5
H3 Hook & Eye
Pre-Drilled Hole For Eye
Alternate Hook Location
Eye
Hook