Ita
lia
no
IT
Ita
lia
no
IT
Ita
lia
no
IT
150
120
70
60
1
2
Pa
g.
1111
-
Ma
n
u
al
c
od
e:
11
9
G
9
1
4
1
11
9
G
9
1
4
1
ve
r.
33
0
2
/2
0
15
© U
R
B
A
C
O
S
.A
. -
Th
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n
URB
A
C
O
S
.A.
to n
otify u
se
rs.
E
n
glish
EN
Dimensions and holes spans
Provided with:
• M8 cage nuts – 4 pieces
• washers – 4 pieces D8x24
• securing screws –
4 pieces M8x16 UNI 5739
• securing screws for
inspection flange
Flange for inspection
on both sides
4 square holes for the M8
locked nuts
Conduits connecting area
Check that the fastening point is resistant and
protected against hurting. The fastening should be
carried out with suitable screws, plugs, etc. (not
included), depending on
the surface typology.
1- hook the M8 cage
nuts as shown in
picture n°1
2- then anchor the
reinforcement to the
floor
3- and finally, as shown in picture n°2, fasten the
technical centre to the reinforcement using the
supplied screws
6.2 Technical centre fastening with reinforcement (optional – COREH02-LUX code)