
VALVE
TRAIN
INSPECTION
&
ADJUSTMENT
(CONT.)
Step 4
If the free play clearance is not within
specifications adjust as necessary. First loosen
the jam nut and turn the adjustment bolt.
Step 5
After adjustment reconfirm the clearance is
within specifications.
Step 6
Replace the valve cover gasket if needed and re-
install the valve cover.
Step 7
Repeat the process on the right side by rotating
the engine with the kick starter 360 degrees.
Again, both valves will be closed and the TDC
mark should be centered in the window.
CAUTION
OPERATING THE ENGINE WITH IMPROPERLY
ADJUSTED VALVES CAN LEAD TO POOR
PERFORMANCE AND POSSIBLE ENGINE
DAMAGE.
Содержание CT
Страница 1: ......
Страница 2: ...Intentionally left blank ...
Страница 35: ...LUBRICATION DIAGRAM ...
Страница 68: ...SIDECAR ALIGNMENT DIAGRAM ...
Страница 80: ...7 EFI Troubleshooting Page Engine Management MIL Blink Codes 7 2 Service Notes 7 4 ...
Страница 83: ...SERVICE NOTES ...
Страница 84: ...8 Warranty Information Page Warranty Agreement 8 2 Warranty Disclaimers 8 3 ...
Страница 88: ...9 Emission Control Information Page Crankcase Emission Diagram 9 2 ...
Страница 90: ...10 Owner s Documents New Owner Form New Address Form Training Rebate Form ...
Страница 91: ...Intentionally left blank ...
Страница 93: ...Intentionally left blank ...
Страница 95: ...Intentionally left blank ...
Страница 97: ...For current wiring schematics please visit Ural Motorcycles website at www imz ural com ...
Страница 98: ......