Page 2-7
Operation and Specifications
2.4 - Transporting Work Platform
TM12 Work Platform - European
2.4 T
RANSPORTING
W
ORK
P
LATFORM
Figure 2-6:
Transporting the Work Platform
B
Y
F
ORKLIFT
Forklift from the side by lifting under the
chassis modules.
B
Y
C
RANE
Secure straps to chassis lifting/tie down
points only.
B
Y
T
RUCK
1. Maneuver the work platform into trans-
port position and chock wheels.
2. Secure the work platform to the trans-
port vehicle with chains or straps of
adequate load capacity to the chassis
lifting/tie down points.
3. Open the Emergency Lowering Valve.
The platform must be in the fully low-
ered position for transport.
Fo
rklift:
Side
Lift/Tie
Down
Points
Controller Assembly
D A N G E R
!
!
Forklifting is for transporting only.
See specifications for weight of work platform and be certain that forklift is of
adequate capacity to lift the work platform.
C A U T I O N
!
!
Overtightening of chains or straps attached to tie down lugs may result in
damage to work platform.
Содержание TM12
Страница 1: ...TM12 ...
Страница 10: ...Page VI Table of Contents List of Tables TM12 Work Platform European NOTES ...
Страница 60: ...Page 3 34 Maintenance 3 18 Torque Specifications TM12 Work Platform European NOTES ...
Страница 74: ...Page 5 6 Schematics 5 3 Hydraulic Tm12 Work Platform European NOTES ...
Страница 77: ...Page 6 3 Illustrated Parts Breakdown Final Assembly TM12 Work Platform European Drawing 1 of 2 ...
Страница 78: ...Page 6 4 Illustrated Parts Breakdown Final Assembly TM12 Work Platform European Drawing 2 0f 2 ...
Страница 79: ...Page 6 5 Illustrated Parts Breakdown TM12 Work Platform European NOTES ...
Страница 81: ...Page 6 7 Illustrated Parts Breakdown Basic Assembly TM12 Work Platform European ...
Страница 85: ...Page 6 11 Illustrated Parts Breakdown Chassis Assembly 3 of 4 TM12 Work Platform European Drawing 3 of 4 ...
Страница 88: ...Page 6 14 Illustrated Parts Breakdown Hose Kit TM12 Work Platform European ...
Страница 101: ......