Page 4
3 S
AFETY
I
NSPECTION
4. Open the Inspection hatches on both sides of the upper mast cover. Check that the AC
mains cable is disconnected from the battery charger. Check the electrolyte level in
each battery cell. Top up as necessary with distilled water only.
5. Use the automated battery top-up system fill the batteries to the correct electrolyte
level. This is done by opening the shut off valve and pressing the green fill button for
approximately 10 seconds, then re-closing the shut-off valve.
Batteries should be examined for cracks, acid leakage and terminal corrosion. Take
corrective action immediately if either check fails.
Figure 3: Battery Fill Button & Valve
Figure 4: Lower Control Panel
Battery fill Button
Shut off Valve
In CLOSED Position
C A U T I O N
!
!
Vehicles fitted with the automated battery top-up system
with
shut
off valve, top up the battery cells with distilled water using the
electrolyte fill button, ensuring that the shut-off valve is open during
the fill and closed after use.
This is the
only
time this valve should be opened.
1. Enable Button
2. Analog Rocker
3. Mast Button
4. Jib Button
5. Rotate Button
6. Emergency Stop
1
3
5
2
4
6
Содержание MB20N
Страница 2: ...NOTES...
Страница 4: ...NOTES...
Страница 28: ...Notizen...
Страница 30: ...Notizen...
Страница 54: ...NOTES...
Страница 56: ...NOTES...
Страница 80: ...NOTAS...
Страница 82: ...NOTAS...
Страница 106: ...NOTE...
Страница 108: ...NOTE...