
3
UPLIFT Desk 1-800-349-3839
Part # Description
Qty
Leg 2
Foot 2
Crossbar End
2
Crossbar Center Rail
2
Side Bracket
2
Adhesive Pads
10
Control Box
1
Keypad 1
Leveling Studs (Pre-Installed)
4
Wires (Power & Connector wires)
3
M6x1.0x14 Machine Screw
24
M6x1.0x10 Machine Screw
8
M-5x16 Pan Head Screw
12
Cable Clips
10
4.
PARTS LIST
Qty 2
Feet*
Qty 2
Legs
Qty 2
Crossbar End
Qty 2
Crossbar Center Rails
Qty 1
Keypad
(choice of 2)
Qty 10
Adhesive Pads
Qty 4
Leveling
Studs
(pre-installed)
Qty 3
Wires
Qty 1 power cord
Qty 2 connecting
cables
Components
Tools Required
Qty 24
M6x1.0x14
Machine
Screws
Qty 8
M6x1.0x10
Machine
Screws
Qty 12
M-5x16
Pan Head
Screws
Qty 10
Cable
Clips
Hardware
Allen Wrench (included)
Tape Measure
Philips Head Screwdriver, and/or Power Drill
Please count all pieces before disposing of any carton or packing material. Use a padded or carpeted
area for assembly to avoid damage. For ease and safety, we recommend two people for assembly.
Qty 2
Side Brackets*
Qty 1
Control Box
or
1
1
1
2
2
2
4
4
14
13
12
12
11
11
11
11
11
11
11
10
9
8
8
7
7
6
6
5
5
5
3
3
1
2
4
14
13
12
11
10
9
8
7
6
5
3