background image

 

Page 17 of 23 

 

 

 

5. 

Maintenance and Care

 

 
 

Every machine is only as reliable as maintenance is carried out. 

 
The manufacturer offers maintenance agreements for every machine 
comprising the yearly safety inspection. Contact your local distributor for 
more information.  
 
The machine to be inspected every year by qualified personnel, in order 
to guarantee trouble-free and safe operation. Inspection results to be 
recorded and to be made available to authorities on request. The 
manufacturer offers qualified service personnel to carry out safety 
inspections at attractive prices. 
 
In order to guarantee reliability and trouble free operation of the 
machine, it is of vital interest to follow the instructions below: 
 
 

If the required maintenance intervals are disregarded, warranty will 
expire.  

 
 

 

High Pressure Pump 

First oil change after 50 operating hours, further oil changes after every 500 operating 
hours, minimum once per year. In case the oil becomes milky due to condensate 
formation, stop the machine immediately and carry out oil change. If this happens 
repeatedly, arrange replacement of all pump seals by qualified personnel.   

 

For the high pressure pump only special pump oil OSP to be used, as 
otherwise guarantee expires. 
 
 

 

 

 

 

 

 

 

 

 

 

 

Содержание HPC Extreme 330

Страница 1: ...Page 1 of 23 03 13 Instruction Manual HPC Extreme 330 405 520...

Страница 2: ...Page 2 of 23...

Страница 3: ...ge 5 6 3 Configuration Operation Illustrations Page 7 10 4 Start up Operation Shut down Page 11 16 5 Maintenance and Care Page 17 18 6 Electric Wiring Diagram Page 19 7 Technical Data Page 20 8 Troubl...

Страница 4: ...available to authorities on request The manufacturer offers qualified service personnel to carry out safety inspections at attractive prices The packing materials plastic foil wood cardboard boxes nai...

Страница 5: ...e severe accidents during operation Therefore high pressure hoses to be carefully inspected before start up and replaced by original equipment in case of damage Use of other than original equipment wh...

Страница 6: ...cannot move The unit is equipped with a parking brake which must be set during working During loading hoisting device to be fastened properly at jack rings Ensure balanced load Repair work in the hig...

Страница 7: ...by more than 10 and returns the water which cannot be taken by the nozzle back into the suction line of the pump Model HPCExtreme 330 only By opening of the rotary handle of the double lance the worki...

Страница 8: ...Page 8 of 23...

Страница 9: ...Page 9 of 23...

Страница 10: ...Page 10 of 23...

Страница 11: ...h pressure pump oil window dip stick High pressure pump OSP special pump oil see Technical Data Pump pump connections whether leaking Machine only to be run with absolutely clean water Before connecti...

Страница 12: ...ter supply will cause heavy damage on high pressure pump cavitation Power Supply Arrange correct electric connection with correct plug socket see electric wiring diagram and type shield which is prote...

Страница 13: ...ulation mode If in this working condition the water temperature exceeds 60 C a thermo valve opens releases small amounts of hot water and same amount of cold water enters After Work Push EMERGENCY STO...

Страница 14: ...e In case of malfunctions eliminate cause according to chapter Trouble Shooting call qualified service In case frost is likely frost protection to be carried out see chapter Maintenance and Care other...

Страница 15: ...lation mode If in this working condition the water temperature exceeds 60 C a thermo valve opens releases small amounts of hot water and same amount of cold water enters After Work Push EMERGENCY STOP...

Страница 16: ...e In case of malfunctions eliminate cause according to chapter Trouble Shooting call qualified service In case frost is likely frost protection to be carried out see chapter Maintenance and Care other...

Страница 17: ...personnel to carry out safety inspections at attractive prices In order to guarantee reliability and trouble free operation of the machine it is of vital interest to follow the instructions below If t...

Страница 18: ...l dip water connecting hose into anti freeze liquid and start pump by pressing motor protection switch and red frost protection switch on the right side of electric box simultaneously Open spray pisto...

Страница 19: ...Page 19 of 23 6 Electric Wiring Diagrams Model HPCExtreme 330 405 520 400 Volt 3 50 Hz 440 Volt 3 60 Hz...

Страница 20: ...30 A Noise level Lp Lw 61 74 dB A 62 71 dB A 69 81 dB A Recoil force 94 N 106 N 99 N Dimensions L x W x H mm 740 x 610 x 740 mm 800 x 600 x 750 mm 800 x 600 x 810 mm Weight 115 kg 159 kg 166 kg Water...

Страница 21: ...eplace fuse If it burns again call qualified service Electric motor suddenly stops motor protection switch trips Poor water supply Fuse burnt phase missing Low wrong voltage Eliminate cause and re sta...

Страница 22: ...von uns genehmigten nderungen der Maschine verliert diese Erkl rung ihre G ltigkeit This declaration is ceased in case of alterations of the product not approved by us 22949 Ammersbek 30 12 2009 ppa...

Страница 23: ...deplads Havn Fredericia Frederiksund Frederiksvaerk Fredrikshavn Faaborg Gedser Great Belt Grenaa Graasten Gulfhavn Haderslev Halsskov Hanstholm Helsingor Hirtshals Hobro Holbaek Horsens Kalundborg Ke...

Отзывы: