4
© 2021 United States Stove Company
ASSEMBLY INSTRUCTIONS
FOR CUSTOMER SERVICE CALL: 800-750-2723 EXT 5050
UNPACK AND INSPECT
Remove the packing from the appliance and inspect
for any damage. Ensure that the bricks are positioned
correctly and not broken (see illustration for proper brick
arrangement). Make sure that the baffle board, above the
air tubes, is in place and undamaged.
BLOWER ASSEMBLY
The blower assembly must be disconnected from
the source of electrical supply before attempting the
installation.
1. Remove the Panel (A) using tin snips or knock out
using a hammer and chisel careful not to distort the
mounting surface.
2. Attach the Blower Mounting Box (B) to the rear of the
unit using four(4) of the supplied #10 screws.
3. Then mount the Blower Assembly (C) with the four
(4) remaining screws.
CABINET DOOR KNOB ASSEMBLY
The cabinet door knob is mounted on the inside of the
cabinet door for shipping purposes and must be removed
and re-installed for proper usage. To get the cabinet door
open, place your hand under the cabinet frame (right-
hand side of the cabinet door) and pull out on the door.
Follow these instructions for door knob assembly:
1. Remove the machine screw and the door knob.
2. Place the knob on the outside of the cabinet door, re-
install the machine screw and tighten. Be careful not
to strip out the threads in the handle.
MACHINE
SCREW
CABINET DOOR
KNOB
HANDLE & FEED DOOR OPERATION
1. Lift the handle up to disengage the latch.
2. Crack open the feed door for approximately 10
seconds to allow excess heat to escape.
3. After approximately 10 seconds lower the handle and
continue to pull the door open.
NOTE: During opening and closing of the feed and ash
doors of this heater, it may seem that the fit of the door is
“too tight”. As the heater is fired, the gasketing “settles”
or “seats” itself in the door. The tight fit at the factory and
before the heater’s initial firing is to ensure a good seal