5
Unpacking And Preassemble
UNPACKING
1. Remove all packaging from the furnace.
2. Remove the supplied tools and parts from the furnace.
BRICK ALIGNMENT
Inspect for any damage. Ensure that the bricks are positioned correctly and not broken (see illustration for
proper brick arrangement).
TOOLS AND MATERIALS NEEDED FOR INSTALLATION
The following is a list of tools and materials needed to install your furnace.
• 7/16” socket wrench.
• 5/16” socket (Best if using a power drill and a socket bit).
• Pair of pliers or channel-locks.
• Power drill with an 1/8” drill bit to install sheet metal screws into connector pipe..
• Sheet metal screws.
• Non-combustible floor protector as specified in this manual.
• All chimney and chimney connector components required for your particular venting installation..
• Electrical wiring tools and supplies.
• Ductwork for supply and return air.
Proper Fire Brick Alignment
Содержание Clayton CL1660E
Страница 9: ...9 INSTALLATION ADD ON INSTALLATION...
Страница 27: ...27...