background image

  

 

 

WIRING 

It  is  recommended  that  installation  and  maintenance  of  this  equipment  should  be  done  with  reference  to  the  current 
edition  of  the  I.E.E.  wiring  regulations  (BS7671)  by  suitably  qualified/trained  personnel.  These  regulations  contain 
important  requirements  regarding  safety  of  electrical  equipment  (for  International  Standards  refer  to  I.E.C/  directive 
IEC950). 

Warning! Isolate the mains supply before commencing any work on the unit. Failure to do so could result in 
serious injury or fatality. 

The unit is fitted with three cable glands. The first gland on the left is for the mains supply the second is for the Load the 
small gland on the right is for the enable input. Only one cable should be fitted per gland to prevent degrading the unit’s 
IP rating.  

The mains supply connects to the terminal block marked ‘LINE’. Connect the supply LIVE to the ‘L’ terminal, NEUTRAL 
to the ‘N’ terminal and EARTH to the ‘E’ terminal. 

The load connects to the terminal block marked ‘LOAD’. Connect the load LIVE to the ‘L’ terminal, NEUTRAL to the ‘N’ 
terminal and EARTH to the ‘E’ terminal. 

If an external enable signal is used it should be connected to the terminal block marked ‘ENABLE’. If no enable input is 
needed a wire link should be inserted into the Enable terminal. 

Important! Ensure all earth wires are connected to maintain earth continuity. 

Check all wiring and make sure the cable glands are tightened. 

COMMISSIONING 

Set the Secs Cermet (VR2) to a value between 1 and 5 seconds. Also if the Pedestal (VR1) needs to be used move it 
to a position between 0-40% if it is not being used it should be at 0%. If an enable switch needs to be attached take the 
link attached to the ENABLE terminal and fit the switch. Replace the lid and switch on the mains supply to the unit. The 
soft start should start once it has been powered on if the link is fitted or when the ENABLE switch has been engaged. 

 

 

Содержание SSC-6kW

Страница 1: ...X20012 Soft Start with Bypass Contactor 6kW Issue 1 User Manual Date 4 08 16 Page 1 of 7 KEY FEATURES Soft start Pedestal Easy to install ...

Страница 2: ...predetermined ramp up time of 1 to 5 seconds It also has a pedestal which is used to adjust the start of the sine wave the range of this is 0 40 The soft start is used to help eliminate high inrush current This helps protect the Load from getting damaged and eliminates nuisance MCB trips INSTALLATION SAFETY FIRST Please read these instructions before installing and operating this product The Soft ...

Страница 3: ...upply LIVE to the L terminal NEUTRAL to the N terminal and EARTH to the E terminal The load connects to the terminal block marked LOAD Connect the load LIVE to the L terminal NEUTRAL to the N terminal and EARTH to the E terminal If an external enable signal is used it should be connected to the terminal block marked ENABLE If no enable input is needed a wire link should be inserted into the Enable...

Страница 4: ...WIRING DIAGRAM ...

Страница 5: ...he cable glands facing down Use these template dimensions to locate the 4 mounting hole centres prior to drilling IMPORTANT Drilling of any holes through the enclosure will immediately invalidate the warranty of the unit The unit MUST be orientated with the cable glands facing down ...

Страница 6: ...iate for your applications are available on request CODE IDENTITY DESCRIPTION X10255 SRA Safety requirements Addressing the Low Voltage Directive LVD including Thermal data cooling Live parts warning Earth requirements and Fusing recommendations P01 1 COS UAL Conditions of sale ORDER DETAILS When ordering directly please use the following stock code A403156 NOTE It is recommended that installation...

Страница 7: ... u t h p o r t P R 8 4 H Q T e l 4 4 0 1 7 0 4 5 1 6 5 0 0 F a x 4 4 0 1 7 0 4 5 1 6 5 0 1 E m a i l s a l e s u n i t e d a u t o m a t i o n c o m W e b w w w u n i t e d a u t o m a t i o n c o m PRODUCT APPLICATION Transformers Motors Compressors All resistive loads ...

Отзывы: