FORM 145.26-IOM1 (908)
7
JOHNSON CONTROLS
7. WALL OPENINg
A finished opening in an outside wall is required
for intake and exhaust of condenser airflow. The
wall opening required is 16” wide by 63” high for
S models. The wall opening must be flush with the
finished floor. Consult local ordinances for building
opening framing requirements.
8. WALL SLEEVE
A wall sleeve is required to finish the wall open
-
ing. a factory-made wall sleeve is available as
an optional accessory for new construction. Use
a spirit level or plumb line to make sure that the
wall sleeve vertical flanges, which must mate with
the back of the unit, are perfectly vertical. Correct
this if necessary, or the unit will not seal properly
against the wall sleeve. a roll of 1 inch wide x ¼
inch thick self adhesive rubber gasket is packed
in the blower compartment of the Skypak unit, to
be used for sealing between the wall sleeve and
the unit. Before moving the unit into final position,
apply selfadhesive sponge rubber gasket to all
the mating flanges on the wall sleeve, be sure to
apply gasket material to the divider panel flange
between the top and bottom sections of the wall
sleeve. also apply gasket material to the top sur-
face of the horizontal lip at the bottom of the wall
sleeve.
9. EXTERIOR gRILLE
Finish the sleeve exterior with a factory supplied
intake and discharge grille.