Unitary products group GY8S Series Скачать руководство пользователя страница 3

035-20464-002 Rev. A (1004)

Unitary Products Group

3

INSPECTION

As soon as a unit is received, it should be inspected for possible dam-
age during transit. If damage is evident, the extent of the damage
should be noted on the carrier’s freight bill. A separate request for
inspection by the carrier’s agent should be made in writing. Also, before
installation the unit should be checked for screws or bolts, which may
have loosened in transit. There are no shipping or spacer brackets
which need to be removed.

FURNACE LOCATION AND CLEARANCES

The furnace shall be located using the following guidelines:

1.

Where a minimum amount of air intake/vent piping and elbows will
be required.

2.

As centralized with the air distribution as possible.

3.

Where adequate combustion air will be available (particularly
when the appliance is not using outdoor combustion air).

4.

Where it will not interfere with proper air circulation in the confined
space.

5.

Where the outdoor vent terminal will not be blocked or restricted.
Refer to “VENT CLEARANCES” located in SECTION VII of these
instructions. These minimum clearances must be maintained in
the installation.

6.

Where the unit will be installed in a level position with no more
than 1/4” (6.4 mm) slope side-to-side and front-to-back to provide
proper condensate drainage.

Installation in freezing temperatures:

1.

Furnace shall be installed in an area where ventilation facilities
provide for safe limits of ambient temperature under normal oper-
ating conditions. Ambient temperatures may fall below 32° F (0° C)
providing the flue temperature does not fall below 260° F (127° C)
at any point in the flue pipe between the furnace and the chimney
or a B-Vent. The flue products will condense in the vent pipe if the
flue temperature falls below 260° F (127° C) causing the vent pipe
to deteriorate rapidly.

2.

Do not allow return air temperature to be below 55º F (13° C) for
extended periods. To do so may cause condensation to occur in
the main heat exchanger, leading to premature heat exchanger
failure.

3.

If this furnace is installed in an unconditioned space and an
extended power failure occurs, there will be potential damage to
the internal components. Following a power failure situation, do
not operate the unit until inspection and repairs are performed.

Clearances for access:

Ample clearances should be provided to permit easy access to the unit.
The following minimum clearances are recommended:

1.

Twenty-four (24) inches (61 cm) between the front of the furnace
and an adjacent wall or another appliance, when access is
required for servicing and cleaning.

2.

Eighteen (18) inches (46 cm) at the side where access is required
for passage to the front when servicing or for inspection or
replacement of flue/vent connections.

In all cases, accessibility clearances shall take precedence over clear-
ances for combustible materials where accessibility clearances are
greater.

Installation in a residential garage:

1.

A gas-fired furnace for installation in a residential garage must be
installed so the burner(s) and the ignition source are located not
less than 18 inches (46 cm) above the floor, and the furnace must
be located or protected to avoid physical damage by vehicles.

SECTION II: DUCTWORK

DUCTWORK GENERAL INFORMATION

The duct system’s design and installation must:

1.

Handle an air volume appropriate for the served space and within
the operating parameters of the furnace specifications.

2.

Be installed in accordance with standards of NFPA (National Fire
Protection Association) as outlined in NFPA pamphlets 90A and
90B (latest editions) or applicable national, provincial, or state, and
local fire and safety codes.

3.

Create a closed duct system. For residential and Non-HUD Modu-
lar Home installations, when a furnace is installed so that the sup-
ply ducts carry air circulated by the furnace to areas outside the
space containing the furnace, the return air shall also be handled
by a duct(s) sealed to the furnace casing and terminating outside
the space containing the furnace.

4.

Complete a path for heated or cooled air to circulate through the
air conditioning and heating equipment and to and from the condi-
tioned space.

The furnace area must not be used as a broom closet or for any
other storage purposes, as a fire hazard may be created. Never
store items such as the following on, near or in contact with the fur-
nace.

1. Spray or aerosol cans, rags, brooms, dust mops, vacuum

cleaners or other cleaning tools.

2. Soap powders, bleaches, waxes or other cleaning com-

pounds; plastic items or containers; gasoline, kerosene, ciga-
rette lighter fluid, dry cleaning fluids or other volatile fluid.

3. Paint thinners and other painting compounds.
4. Paper bags, boxes or other paper products

Never operate the furnace with the blower door removed. To
do so could result in serious personal injury and/or equipment
damage.

Improper installation in an ambient below 32ºF (0.0° C) could create
a hazard, resulting in damage, injury or death.

TABLE 1: 

Unit Clearances to Combustibles

APPLICATION

TOP

FRONT

REAR

LEFT SIDE RIGHT SIDE

FLUE

FLOOR/ 

BOTTOM

CLOSET ALCOVE ATTIC

LINE 

CONTACT

In. (cm) In. (cm) In. (cm)

In. (cm)

In. (cm)

In. (cm)

UPFLOW

1 (25.4)

6 (15.24)

0 (0.0)

0 (0.0)

3 (7.62)

1

1.

14-1/2” cabinet models only. All other units “0” clearance.

6 (15.24)

COMBUSTIBLE

YES

YES

YES

NO

UPFLOW B-VENT

1 (25.4)

3 (7.62)

0 (0.0)

0 (0.0)

0 (0.0)

1 (25.4)

COMBUSTIBLE

YES

YES

YES

NO

HORIZONTAL

2

2.

14-1/2” cabinet left airflow applications only. All other units and right hand airflow applications “0” clearance.

6 (15.24)

0 (0.0)

1 (25.4)

0 (0.0)

6 (15.24)

COMBUSTIBLE

NO

YES

YES

YES

3

3.

Line contact only permitted between lines formed by the intersection of the rear panel and side panel (top in horizontal position) of the furnace jacket and building joists, studs or framing.

HORIZONTAL B-VENT

0 (0.0) 

3 (7.62)

0 (0.0)

1 (25.4)

0 (0.0)

1 (25.4)

COMBUSTIBLE

NO

YES

YES

YES

3

Содержание GY8S Series

Страница 1: ...TERS 7 GAS PIPING 8 ELECTRICAL POWER 9 TWINNING AND STAGING 11 VENT SYSTEM 13 SAFETY CONTROLS 18 START UP AND ADJUSTMENTS 19 WIRING DIAGRAM 26 LIST OF FIGURES Dimensions 5 Furnace Base Rectangular Per...

Страница 2: ...ead and follow all instructions in this manual can result in furnace malfunction death personal injury and or property damage Furnaces for installation on combustible flooring shall not be installed d...

Страница 3: ...er clear ances for combustible materials where accessibility clearances are greater Installation in a residential garage 1 A gas fired furnace for installation in a residential garage must be installe...

Страница 4: ...he total square inch of duct attached to the furnace plenum is 300 8 square inch This exceeds the recommended 280 square inch of duct In this example the duct system attached to the plenum has a suffi...

Страница 5: ...above the maximum supply air temperature will cause the heat exchanger to overheat causing premature heat exchanger failure Improper duct sizing dirty air filters incorrect manifold pressure incorrect...

Страница 6: ...thout a Cooling Coil Cabinet When installing this appliance the furnace must be installed so as to create a closed duct system the supply duct system must be con nected to the furnace outlet and the s...

Страница 7: ...the filter exter nal to the cabinet IMPORTANT Some accessories such as electronic air cleaners and pleated media may require a larger side opening Follow the instruc tions supplied with that accessory...

Страница 8: ...ge to the furnace or some of its components that will result in property damage and loss of life FIGURE 6 Gas Valve INLET WRENCH BOSS INLET PRESSURE PORT O N O FF ON OFF SWITCH Shown in ON position MA...

Страница 9: ...conversions are required in order for the appliance to satisfactory meet the application An authorized distributor or dealer must make all gas conversions In Canada a certified conversion station or o...

Страница 10: ...o the terminal board on the ignition module as shown in Figure 7 Electronic thermo stats may require the common wire to be connected as shown with the dashed line in Figure 7 or 8 Apply strain relief...

Страница 11: ...e mixing device must be installed before any ducts that supply air to occupied spaces Twinning causes both indoor fans to operate simultaneously If a mixing device is not used any ducts that are conne...

Страница 12: ...Staging The single wire twinning feature of this board can also be used for stag ing of two furnaces With this feature a single wire is connected between the TWIN terminal on one furnace board to the...

Страница 13: ...e converted for high altitude operation Refer to SECTION IV GAS PIP ING of these instructions and the proper high altitude application instruction for details VENTING INTO AN EXISTING CHIMNEY For Cate...

Страница 14: ...on FAN ASSISTED FURNACE WATER HEATER FAN ASSISTED FURNACES VENT PIPE HOT WATER TANK FURNACE OPTIONAL SIDEWALL VENT SYSTEM field supplied EXTERIOR VENT HOOD FIGURE 19 Typical Sidewall Vent and Terminat...

Страница 15: ...to prevent sagging The vent system may be supported by the use of clamps or hangers secured to a permanent part of the structure every 4 ft 1 22 m FAN ASSISTED COMBUSTION SYSTEM An appliance equipped...

Страница 16: ...sub tracting the blockage area of all fixed louvers grilles or screens from the gross area of the opening 2 Apertures in a fixed louver a grille or screen shall have no dimen sion smaller than 0 25 0...

Страница 17: ...horizontally from the burner level of the appliance Refer to AIR SOURCE FROM OUTDOORS AND VENT AND SUPPLY AIR SAFETY CHECK in these instructions for additional information and safety check procedure 2...

Страница 18: ...he combustion air blower heat exchanger or a blocked vent pipe connection Corrective action is required These are manual reset controls that must be reset before operation can continue CARBON MONOXIDE...

Страница 19: ...ngth x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 3 175 mm reducing coupling 1 1 8 0 3 cm adapter There is a accessory kit 1PK0602 available from Source 1 which has the following...

Страница 20: ...ivided by the time it took to measure 2 cubic ft 0 0566 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 14 times 0 00283 m3 of gas measured at...

Страница 21: ...e the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator screw for the appropriate gas per the following IMPORTANT If gas valve regulator is turned in clockwise manifol...

Страница 22: ...pres sure drop 3 Determine the External System Static Pressure ESP without the filter 4 Select a filter pressure drop from the table based upon the number of return air openings or return air opening...

Страница 23: ...7 Medium 1470 1450 1440 1430 1390 1360 1310 1270 1220 1150 41 6 41 1 40 8 40 5 39 4 38 5 37 1 36 0 34 5 32 6 Low 1260 1260 1260 1260 1250 1200 1150 1110 1070 1010 35 7 35 7 35 7 35 7 35 4 34 0 32 6 31...

Страница 24: ...52 4 48 4 44 5 36 8 Medium Low 1690 1690 1650 1610 1540 1480 1410 1280 1170 1030 47 9 47 9 46 7 45 6 43 6 41 9 39 9 36 2 33 1 29 2 Low 1350 1330 1310 1290 1260 1220 1150 1050 970 860 38 2 37 7 37 1 3...

Страница 25: ...s SEE CHART PAGE 6 1PS0302 1PS0311 1PS0312 1BR0314 EXTERNAL BOTTOM RETURN FILTER with High Velocity Filter for Horizontal Application for Upflow Bottom Return Application 14 1 2 CABINETS 1BR0317 17 1...

Страница 26: ...035 20464 002 Rev A 1004 26 Unitary Products Group SECTION X WIRING DIAGRAM FIGURE 31 Wiring Diagram...

Страница 27: ...035 20464 002 Rev A 1004 Unitary Products Group 27 NOTES...

Страница 28: ...e without notice Printed in U S A 035 20464 002 Rev A 1004 Copyright by York International Corp 2004 All rights reserved Supersedes 035 20464 001 Rev A 0704 Unitary 5005 Norman Product York OK Group D...

Отзывы: