![Unitary products group G8C 50 Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/unitary-products-group/g8c-50/g8c-50_installation-instructions-manual_844068003.webp)
3
PRE-INSTALLATION INSPECTION
Inspect the shipping container and furnace for any
evidence of shipping damage.
If furnace damage is found, notify freight carrier and
file claim.
NOTE: Some models are equipped with a shipping
strap on the blower motor shaft which
supports the blower motor during shipping.
This strap must be removed before the
furnace is operated for the first time. It can
be removed by removing the two fastening
screws.
CODE COMPLIANCE
The furnaces described in these instructions are
design certified by the American Gas Association to
be in compliance with the latest edition of American
National Standard Z21.47. In Canada, these
furnaces are design certified by the Canadian Gas
Association to be in compliance with the latest
edition of CAN/CGA 2.3.
These furnaces are forced air type and may be
utilized for indoor installation in manufactured
buildings (modular only), or buildings constructed on
site. These furnaces are not certified for installation
in mobile homes, trailers or recreational vehicles.
The installer must conform to all state, local and
provincial building codes when installing these
appliances. In the absence of state, local or provin-
cial codes, these furnaces and related equipment
must be installed in accordance with the latest issue
of the following:
NATIONAL FUEL GAS CODE - ANSI Z223.1
NATIONAL ELECTRICAL CODE, ANSI/NFPA 70.
Applicable codes take precedence over any recom-
mendation made in these instructions.
In Canada, the installer must conform to the
CAN/CGA-B149 Installation Codes, the Canadian
Electrical Code, Part I, CSA C22.1, local plumbing or
waste water codes, and other applicable local
codes.
INSTALLATION POSITION
This furnace may be installed in an upflow, downflow
or horizontal position. Depending on the configura-
tion shipped from the factory, it may be necessary to
convert the furnace from downflow to upflow or from
upflow to downflow configuration. Use conversion
instructions starting on Page 3.
CONVERSION INFORMATION
This furnace may be shipped in either the upflow or
the downflow configuration. To convert from upflow
to downflow or vice-versa it is necessary only to
exchange the top and bottom casing caps and to
rotate the vent blower 180 degrees. Use the step by
step instructions on next page.
Содержание G8C 50
Страница 11: ...11 FIGURE 9 DOWNFLOW CONFIGURATION FIGURE 10 UPFLOW CONFIGURATION ...
Страница 23: ...23 ...