035-18877-001-B-0203
Unitary Products Group
7
CLEARANCES
Refer to the unit dimension details, Figure 15 for clearances
required for servicing and for proper unit operation.
VERTICAL / HORIZONTAL INSTALLATION
The FF-10 unit is shipped for vertical installation with a
vertical air discharge as shown in Figure 2, but may be
converted to other arrangements per the following
instructions:
1. Remove the panels from the blower section.
2. Remove the four Phillips machine bolts that hold
the coil and blower sections together. A bolt is
located near each corner.
3. Move the blower section to the proper location.
4. Attach the blower section to the coil section with
the machine bolts removed in Step 2.
5. Before replacing the panel, see Duct Connection
and Drain Connection.
6.
Replace the panels.
TABLE 3: FF-10 UNIT SUSPENSION WEIGHTS (LBS)
SUSP'N. POINT
W/ 2 HP MOTOR
W/ HEATER ACCESS
W/ PLENUM ACCESS
W/ HEATER & PLENUM
ACCESS
A
95
95
85
85
B
120
120
100
100
C
95
115
165
185
D
115
140
185
205
T
OTAL
W
T
.
425
470
535
575
FIGURE 2:
VERTICAL AND HORIZONTAL APPLICATION
Содержание FF-10
Страница 19: ...035 18877 001 B 0203 Unitary Products Group 19...