Unitary Products Group

DUCTWORK INSTALLATION AND SUPPLY PLENUM 

CONNECTION

Attach the supply plenum to the furnace outlet duct connec-
tion flanges. This is typically through the use of S cleat
material when a metal plenum is used. The use of an
approved flexible duct connector is recommended on all
installations. This connection should be sealed to prevent
air leakage. The sheet metal should be crosshatched to
eliminate any popping of the sheet metal when the indoor
fan is energized.

When replacing an existing furnace, if the existing plenum is not the
same size as the new furnace then the existing plenum must be
removed and a new plenum installed that is the proper size for the new
furnace. The minimum plenum height is 12” (30 cm). If the plenum is
shorter than 12” (30 cm) the turbulent air flow may cause the limit con-
trols not to operate as designed, or the limit controls may not operate at
all.

The duct system is a very important part of the installation. 

If the duct

system is improperly sized the furnace will not operate properly.

The ducts attached to the furnace plenum, should be of sufficient size
so that the furnace operates at the specified external static pressure
and within the air temperature rise specified on the nameplate.

Table 2 is a guide for determining whether the rectangular duct system
that the furnace is being connected to be of sufficient size for proper fur-
nace operation.

Use the Example below to help you in calculating the duct area to deter-
mine whether the ducts have sufficient area so that the furnace oper-
ates at the specified external static pressure and within the air
temperature rise specified on the nameplate.

Example: The furnace input is 80,000 BTUH, The recommended duct
area is 248 sq.in, there are two 8 x 12 rectangular ducts attached to the
plenum and there are two 7 inch round ducts attached to the furnace.

1.

Take 8 x 14, which equals 112 sq.in. X 2, which equals 224 square
inch then go to round duct size located in Table 3.

2.

The square inch area for 7 inch round pipe is 38.4, multiply by 2 for
two round ducts which equals 76.8 square inch,

3.

Then take the 224 square inch from the rectangular duct and add it
to the 76.8 sq.in. of round duct. The total square inch of duct
attached to the furnace plenum is 300.8 square inch. This exceeds
the recommended 280 square inch of duct.

In this example, the duct system attached to the plenum has a sufficient
area so that the furnace operates at the specified external static pres-
sure and within the air temperature rise specified on the nameplate.

1.

The Air Temperature Rise is determined by subtracting the Return
Air Temperature Reading from the Supply Air Temperature Read-
ing.

2.

The External Static Pressure is determined by adding the Supply
Duct Static Pressure reading to the Return Duct Static Pressure
reading and adding the pressure drop across any applied coil.

TABLES 2 AND 3 are to be used as a guide only to help the installer
determine if the duct sizes are large enough to obtain the proper air flow
(CFM) through the furnace. TABLES 2 and 3 ARE NOT to be used to
design ductwork for the building where the furnace is being installed.
There are several variables associated with proper duct sizing that are
not included in the tables. To properly design the ductwork for the build-
ing, Refer to the ASHRAE Fundamentals Handbook, Chapter on
“DUCT DESIGN” or a company that specializes in Residential and Mod-
ular Home duct designs.

IMPORTANT: 

The minimum plenum height is 12” (30 cm). The furnace

will not operate properly on a shorter plenum height. The minimum rec-
ommended rectangular duct height is 4” (10 cm) attached to the ple-
num.

IMPORTANT: 

The air temperature rise should be taken only after the

furnace has been operating for at least 15 minutes. Temperatures and
external static pressures should be taken 6” (15 cm) past the first bend
from the furnace in the supply duct and the return duct. If an external fil-
ter box or an electronic air cleaner is installed, take the return air read-
ings before the filter box or air cleaner.

The duct system must be properly sized to obtain the correct airflow
for the furnace size that is being installed.
Refer to Table 7 and the furnace rating plate for the correct rise
range and static pressures
If the ducts are undersized, the result will be high duct static pres-
sures and/or high temperature rises which can result in a heat
exchanger OVERHEATING CONDITION. This condition can result
in premature heat exchanger failure, which can result in personal
injury, property damage, or death.

TABLE 2: 

Minimum Duct Sizing For Proper Airflow

Input

Airflow

Return

1

Rectangular

2

Round

2

Supply

3

Rectangular

2

Round

2

BTU/H (kW)

CFM (m³)

In²  (cm²)

in. x in. (cm x cm)

in. (cm) dia.

In² (cm²)

in. x in. (cm x cm)

in. (cm) dia.

40,000 (17.58)

1,200 (33.98)

280 (711)

14 x 20 (35.6 x 50.8)

18 (45.7)

216 (549)

12 x 18 (30.5 x 45.7)

16 (40.6)

60,000 (17.58)

1,200 (33.98)

280 (711)

14 x 20 (35.6 x 50.8)

18 (45.7)

216 (549)

12 x 18 (30.5 x 45.7)

16 (40.6)

80,000 (23.44)

1,200 (33.98)

280 (711)

14 x 20 (35.6 x 50.8)

18 (45.7)

216 (549)

12 x 18 (30.5 x 45.7)

16 (40.6)

80,000 (23.44)

1,600 (45.31)

360 (914)

18 x 20 (45.7 x 50.8)

22 (55.8)

280 (711)

14 x 20 (35.6 x 50.8)

18 (45.7)

100,000 (29.31)

2,000 (56.63)

440 (1,118)

20 x 22 (50.8 x 55.8)

24 (60.9)

390 (991)

16 x 22 (40.6 x 55.8)

22 (55.8)

120,000 (35.17)

2,000 (56.63)

440 (1,118)

20 x 22 (50.8 x 55.8)

24 (60.9)

390 (991)

16 x 22 (40.6 x 55.8)

22 (55.8)

NOTE: This chart does not replace proper duct sizing calculations or take into account static pressure drop for run length and fittings. Watch out for the temperature rise and static pressures.

1.

Maximum return air velocity in rigid duct @ 700 feet per minute (19.82 m

3

 / minute).

2.

Example return main trunk duct minimum dimensions.

3.

Maximum supply air velocity in rigid duct @ 900 feet per minute (25.49 m

3

 / minute).

TABLE 3: 

Round Duct Size

Round Duct Size

Calculated Area For Each Round Duct Size

inches (cm)

Sq.in (cm

2

)

5 (13)

19.6 (126)

6 (15)

28.2 (182)

7 (18)

38.4 (248)

8 (20)

50.2 (324)

9 (23)

63.6 (410)

10 (25)

78.5 (506)

11 (28)

95 (613)

12 (30)

113.1 (730)

13 (33)

132.7 (856)

14 (36)

153.9 (993)

Содержание FC9V

Страница 1: ...des TABLE OF CONTENTS SAFETY 1 DUCTWORK 3 FILTERS 6 GAS PIPING 6 ELECTRICAL POWER 8 COMBUSTION AIR AND VENT SYSTEM 9 CONDENSATE PIPING 16 SAFETY CONTROLS 16 START UP AND ADJUSTMENTS 17 WIRING DIAGRAM...

Страница 2: ...tional vehicles Failure to carefully read and follow all instructions in this manual can result in furnace malfunction death personal injury and or property damage Furnaces for installation on combust...

Страница 3: ...is required for passage to the front when servicing or for inspection or replacement of flue vent connections In all cases accessibility clearances shall take precedence over clear ances for combustib...

Страница 4: ...ABLES 2 AND 3 are to be used as a guide only to help the installer determine if the duct sizes are large enough to obtain the proper air flow CFM through the furnace TABLES 2 and 3 ARE NOT to be used...

Страница 5: ...rn End 5 Be sure to seal the furnace to plenum connections to prevent air leakage Refer to Figure 1 for unit and plenum dimensions Attic installations must meet all minimum clearances to combustibles...

Страница 6: ...28 27 25 2000 57 C 16 x 25 41 x 64 20 x 25 51 x 64 120 112 2000 35 14 32 80 2000 57 D 2 16 x 25 2 41 x 64 22 x 25 56 x 64 All installations must have a filter installed Toe Plate Removable Rectangula...

Страница 7: ...4 National Fuel Gas Code or in Canada CAN CGA B149 1 00 Natural Gas and Propane Installation Code HIGH ALTITUDE PRESSURE SWITCH CONVERSION For installation in locations where the altitude is less than...

Страница 8: ...furnace s control system requires correct polarity of the power supply and a proper ground connection Refer to Figure 6 IMPORTANT The power connection leads and wiring box may be relo cated to the le...

Страница 9: ...hese instructions IMPORTANT The VENT SYSTEM must be installed as specified in these instructions for Residential and Non HUD Modular Homes The sealed combustion air vent system is the only configurati...

Страница 10: ...is as follows 1 Cut piping to the proper length beginning at the furnace 2 Deburr the piping inside and outside 3 Chamfer bevel the outer edges of the piping 4 Dry fit the vent piping assembly from th...

Страница 11: ...1 US Installation2 A Clearance above grade veranda porch deck or balcony 12 inches 30 cm 12 inches 30 cm B Clearance to window or door that may be opened 6 inches 15 cm for applications 10 000 Btuh 3k...

Страница 12: ...bustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 13 or 14 VENTING MULTIPLE UNITS Multiple units can be installed i...

Страница 13: ...STION AIR Combustion air is supplied through a PVC or ABS pipe that is connected to the PVC coupling attached to the burner box and is terminated in a ventilated attic or crawl space The combustion ai...

Страница 14: ...ion smaller than 0 25 6 4 mm 3 A manually operated damper or manually adjustable louvers are not permitted for use 4 A automatically operated damper or automatically adjustable lou vers shall be inter...

Страница 15: ...w usage Follow all notes procedures and required materials in the SEALED COMBUS TION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a ventilate...

Страница 16: ...densate sump pump must be approved for use with acidic condensate CONDENSATE DRAIN TRAP AND DRAIN FREEZE PROTECTION Special precautions MUST be made if installing furnace in an area which may drop bel...

Страница 17: ...bing 2 pieces of 4 10 cm length x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 0 3 cm reducing coupling 1 1 8 0 3 cm adapter 1 Dwyer Manometer These items are required in order to...

Страница 18: ...ivided by the time it took to measure 2 cubic ft 0 0566 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 14 times 0 00283 m3 of gas measured at...

Страница 19: ...as shown in Figure 24 The procedure below is used to adjust either the high fire manifold pressure or the low fire manifold pressure IMPORTANT The cap for the pressure regulator must be removed entir...

Страница 20: ...Heating and Cooling Airflow The heating and the cooling airflows are preset at the factory The heat ing airflow is set to the maximum CFM The cooling airflow is set to pro vide 90 percent of the maxi...

Страница 21: ...all for cooling the motor will ramp up to 63 of full capacity and will stay there for 90 seconds then will ramp up to full capacity At the end of the cooling cycle the motor will ramp down to 63 of fu...

Страница 22: ...4 1880 1250 53 2 35 4 A C 1560 1010 44 2 28 6 1620 1030 45 9 29 2 C B 1470 940 41 6 26 6 1500 960 42 5 27 2 B C 1370 890 38 8 25 2 1410 880 39 9 24 9 D B 1460 930 41 3 26 3 1490 920 42 2 26 1 C A 125...

Страница 23: ...the airflow table i e 0 20 w c 50 Pa 0 60 w c 150 Pa etc the system airflow cor responds to the intersection of the ESP column and Model Blower Speed row TABLE 16 Filter Performance Pressure Drop Inc...

Страница 24: ...ed in U S A 035 20499 001 Rev B 1004 Copyright by York International Corp 2004 All rights reserved Supersedes 035 20499 001 Rev A 0904 Unitary 5005 Norman Product York OK Group Drive 73069 SECTION X W...

Отзывы: