background image

Page

2

Installation 

Manual 

RapidRac™

p

[3.] Components list

 

Bay frame

 – Module mounting frame for all modules 

south of north most row.  6105-T5 aluminum extrusion.

 

Module bracket

 – (No. 10 x ¾”)  – Used to secure 

module to 2-bay and 1-bay frame. 10º tilt angle.  6105-
T5 aluminum extrusion. Integral PEM nuts for quick 
assembly

  

Hex Bolt

  (1/4”  x  3/4”) – Use with all components of 

RapidRac™ except bracket connections to module.  304 
stainless steel.

 

Flat Washer

 (5/16”)  – Use with all components of 

RapidRac™.  304 stainless steel.

 

Serrated Flange nut

 (1/4”) – Use one per hex bolt and 

washer during assembly.  304 stainless steel. Required 
torque: 5 min - 9 max foot-pounds.

 

WEEB 9.5

  – Use with per hex bolt and washer during 

assembly on frame holes facing in towards the array.  
304 stainless steel.

1

2

3

4

5

6

3

2

4

5

1

[2.] Tools required for assembly

[1] Installer responsibility

The installer is solely responsible for:

• Complying with all applicable 

local or national building codes, 
including any that may supersede 
this manual;

• Ensuring that Unirac and other 

products are appropriate for the 
particular installation and the 
installation environment;

• Ensuring that the roof, its rafters, 

connections, and other structural 
support members can support 
the array under building live load 
conditions (this total assembly is 
hereafter referred to as the roof 
rafter assembly);

• Using only Unirac parts and 

installer-supplied parts as specifi ed 
by Unirac (substitution of parts 
may void the warranty);

• Ensuring that lag screws have 

adequate pullout strength and 
shear capacities as installed;

• Maintaining the waterproof 

integrity of the roof, including 
selection of appropriate fl ashing; 
and

• Ensuring safe installation of all 

electrical aspects of the PV array.

7/16 Wrench

6

Содержание RapidRac G10

Страница 1: ...ual Unirac welcomes input concerning the accuracy and user friendliness of this publication Please write to publications unirac com Pub 090924 1ii September 2009 2009 by Unirac Inc All rights reserved p L2 6 s q 2 Installation Manual 601 2 ...

Страница 2: ... 3 4 5 6 3 2 4 5 1 2 Tools required for assembly 1 Installer responsibility The installer is solely responsible for Complying with all applicable local or national building codes including any that may supersede this manual Ensuring that Unirac and other products are appropriate for the particular installation and the installation environment Ensuring that the roof its rafters connections and othe...

Страница 3: ...d flange nuts on all four connections points using WEEB 9 5 on frame holes facing in towards the array Note Make sure to use a piece of cardboard to protect the module from the surface of the roof Bay Frames Step 3 Lower module with module brackets between rows of bay frames Connect using hex bolts and washers on all six connections points Pressed nuts have been attached to the inside of brackets t...

Страница 4: ...ial contingent or incidental damages arising out of the use of the Product by Purchaser under any circumstances If within the specified Warranty periods the Product shall be reasonably proven to be defective then Unirac shall repair or replace the defective Product or any part thereof in Unirac s sole discretion Such repair or replacement shall completely satisfy and discharge all of Unirac s liabi...

Отзывы: