background image

                     Service manual Phyaction V

 

 

 

 

 

Service manual version 0.1

 

 

 

Page 4

 

Data registration document 

 
 

Information 

 

Distributor name 

Distributor address 

 

Customer name 

Customer address 

 

 

Instrument name:  

Serial number: 

Date of delivery:  

 

 

Service activities 

 

Date: 
Error complaint: 

Service action 

Critical spare parts exchange list 

Critical part name 

Old serial number 

New serial number 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date: 
Error complaint: 

Service action 

Critical spare parts exchange list 

Critical part name 

Old serial number 

New serial number 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание Phyaction V

Страница 1: ...pply 5 2 6 Patient Current Routing 5 3 6 Vacuum 5 3 1 6 Control Loop 5 3 2 6 Pulsed Vacuum 5 3 3 7 End of Treatment 5 3 4 7 Water management 6 8 Safety inspection list yearly check up 7 9 Hardware lab...

Страница 2: ...r of the Uniphy family it is built according to the requirements of the MDD security standards All functions of the unit are controlled by a microprocessor ensuring a high degree of reliability and sa...

Страница 3: ...e able to provide the following data for each unit Instrument data Part and serial number Gymna has the original configuration of each unit The Phyaction V has following critical parts Ref 324597 Main...

Страница 4: ...er name Customer address Instrument name Serial number Date of delivery Service activities Date Error complaint Service action Critical spare parts exchange list Critical part name Old serial number N...

Страница 5: ...socket required Insulation Type BF floating patient circuit Fuses 2 x T2AL250V Volume water reservoir 180 ml Working pressure continuous vacuum 38 320 hPa Working pressure pulsation vacuum 58 480 hPa...

Страница 6: ...el B by pressing a button that toggles the choice between traditional and vacuum electrodes 5 3 Vacuum When the vacuum control is turned up air is pumped out to create the vacuum until the set level i...

Страница 7: ...avoidably droplets are sucked into the system These droplets do not only contain water but also fibers from the sponges flakes of skin and other substances present under the cups To prevent these to r...

Страница 8: ...the keys and the display are undamaged Mains entry and power cord are undamaged The output connectors are undamaged The electrode connectors and cables are undamaged All the operation functions work T...

Страница 9: ...ut The last 3 alphanumerical numbers will begin with A A A to Z Increase in case of a principle technology change Components are not anymore compatible with the previous layout All previous changes ma...

Страница 10: ...ing static sensitive devices such as PC boards of the Phyaciton V the following precautions should be observed Persons should be earthed by means of a wrist strap Ground all electrical equipment work...

Страница 11: ...pply PCB Unscrew the 4 screws of the power supply PCB and replace with a new PCB 8 3 Replacement of the Main PCB The main PCB is one board in production that is divided over the front of the unit To r...

Страница 12: ...m the patient We have noticed that is some cases the vacuum is switched off even when there is current detected In order to solve this the unit needs to be modified Step 1 open the unit Step 2 remove...

Страница 13: ...324597 MAIN PCB PHYACTION V VACO 200 324650 CABLE ASSY ET IN VACO500 PHYACTION V 324727 CABLE ASSY MAINS INLET SMPS 200 SERIES 324793 BOTTOM BOX PHYACTION V 324804 METAL TOP COVER PHYACTION V 324837 C...

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ...R247 ELVA003 LO200 V21 pcb Tue Dec 13 10 38 58 2005...

Страница 18: ......

Отзывы: