
Transport, setup and acceptance
22
5.4.2 Process gas
NOTE
•
The connecting parts need to be clean and free of residue. Impurities can
enter the process gas analyser and cause incorrect measurements and/or
damage.
•
The inlet pressure for the gas connections must not exceed the pressure
specified on the instruction sticker on the process gas analyser.
•
Each connection needs to be carefully checked for leaks. If there are any
leaks, the system will draw air, and the measurements will be incorrect.
•
Do not use sealing compound to seal the gas connections as this can lead to
inaccurate measurements. Use PTFE sealing tape.
•
Only use suitable pipes.
•
Use a separate line to drain off the condensate.
ATTENTION
The process gas must be free of condensate and dust if the process gas analyser
has no gas preparation system (or gas cooler).
Содержание INCA6002
Страница 1: ...Apr 2016 V1 10 Translation of the original operating instructions Process gas analyser INCA6002 ...
Страница 3: ...3 Dimensions ...
Страница 10: ...EU Declaration of Conformity 10 ...
Страница 30: ...Transport setup and acceptance 30 ...
Страница 32: ...Startup switching on 32 ...
Страница 46: ...Operation 46 ...
Страница 48: ...Decommissioning switching off 48 ...
Страница 52: ...Maintenance 52 ...
Страница 56: ...Service 56 ...
Страница 58: ...Associated documents 58 ...
Страница 60: ...Disposal 60 ...
Страница 62: ...Spare parts 62 ...
Страница 63: ...63 16 Annex ...
Страница 64: ...Annex 64 EU Declaration of Conformity Flame arrester ...
Страница 65: ...Annex 65 ...