5
Technical data
Gas inlets
Number of measuring
points:
1
Calibration inlets:
1
Purge gas inlets:
1
Gas connections:
Clamp ring connection 6 mm
Max. distance between
measuring point and
analyser:
10 m
Max. gas inlet pressure:
20 mbar relative
Min. gas inlet pressure:
-100 mbar relative
Flame arrester:
ATEX certification G IIC
Relative gas humidity
≤ 100%
Condensate trap:
yes
Calibration gas
Calibration interval:
manual or automatic (configurable between one
hour and up to several weeks)
Duration of calibration:
10 minutes (recommended by the manufacturer)
Gas consumption:
5 l/calibration
Power supply
Voltage:
100-240 V, 50/60 Hz
Power consumption:
max. 1500 VA with optional second heater
Protection class:
I
Degree of protection:
IP54
Interfaces
Relay:
3
Dig. interface:
RS232
Field bus:
optional
Optional relay:
optional
Remote control unit:
optional
Sample gas cooler
Cooling principle:
thermoelectric
Dew point:
3 - 30 °C adjustable
Condensate drain:
Hose pump
Содержание INCA6002
Страница 1: ...Apr 2016 V1 10 Translation of the original operating instructions Process gas analyser INCA6002 ...
Страница 3: ...3 Dimensions ...
Страница 10: ...EU Declaration of Conformity 10 ...
Страница 30: ...Transport setup and acceptance 30 ...
Страница 32: ...Startup switching on 32 ...
Страница 46: ...Operation 46 ...
Страница 48: ...Decommissioning switching off 48 ...
Страница 52: ...Maintenance 52 ...
Страница 56: ...Service 56 ...
Страница 58: ...Associated documents 58 ...
Страница 60: ...Disposal 60 ...
Страница 62: ...Spare parts 62 ...
Страница 63: ...63 16 Annex ...
Страница 64: ...Annex 64 EU Declaration of Conformity Flame arrester ...
Страница 65: ...Annex 65 ...