background image

OPERATING INSTRUCTIONS 

CWD2005 SPC 

 

 

 

 

 

 

chapter 

— page: 

5

—5

 

 

5.3  Ambient conditions 

 

 

 

ATTENTION

 

Ambient conditions during storage and set up. 

Observe the ambient conditions! Contact Union Instruments GmbH if the system 
has been stored for more than three months or needs to be operated or stored 
under ambient conditions other than those specified! 

 

5.3.1  Storage conditions of the system 

Freezing condensate water in the system can cause defects. Make sure that the 
system is free from gas / humidity residue. 
 

Storage temperature: 

-15 - 60°C 

Humidity: 

0 - 95% relative humidity 

Ambient pressure: 

700 - 1400 hPa (0.7 - 1.4 bar)

 

5.4  Installing and connecting 

 

 

DANGER

 

Risk of explosion! 

Danger due to invalid cable glands! 

If improper cable glands are used, the explosion protection cannot be ensured 
anymore! 

 

Only use cable glands approved for the required ignition protection type! 

 

Observe the technical data when selecting/using cable and line glands! 

Danger due to open drilled holes or unused cable glands! 

If drilled holes are open or cable glands unused, the explosion protection cannot 
be ensured anymore! 

 

Always close open drilled holes and unused cable glands with approved 
sealing plugs! 

 

Sealing plugs must be inserted with a tool! 

 

Observe the technical data when selecting/replacing suitable sealing 
plugs! 

 

Содержание CWD2005 SPC

Страница 1: ...Feb 2017 V1 02 OPERATING INSTRUCTIONS AND SAFETY NOTES CWD2005 SPC...

Страница 2: ...truments com http www union instruments com 2017 This documentation is copyrighted The engendered rights are retained in particular the rights to translation reprinting taking pictures radio transmiss...

Страница 3: ...cal data 1 1 2 EC declaration of conformity 2 1 3 Safety notes 3 1 4 Safety device system 4 1 5 Connections transport setting up 5 1 6 Commissioning operation removing from service 6 1 7 Maintenance a...

Страница 4: ...OPERATING INSTRUCTIONS CWD2005 SPC...

Страница 5: ...operating instructions CWD2005 plus Power supply Voltage 230 VAC 50Hz or 115 VAC 50Hz Power consumption 1500 VA max Protection class I Degree of protection IP65 protective housing Compressed air suppl...

Страница 6: ...TING INSTRUCTIONS CWD2005 SPC chapter page 1 2 DANGER The system must not be operated outside of the specified ambient temperature 5 C Tamb 40 C Outside of this temperature range the approval becomes...

Страница 7: ...with compressed air o stainless steel as weather protection two terminal boxes a venting system of the protective housing a compressed air supply with filter controller and manometer a combustion calo...

Страница 8: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 1 4 Fig 1 2 System overview protective housing with combustion calorimeter...

Страница 9: ...STRUCTIONS CWD2005 SPC chapter page 2 1 2 EC declaration of conformity EC Declaration of Conformity for the combustion calorimeter UNION CWD2005 plus see operating instructions combustion calorimeter...

Страница 10: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 2 2...

Страница 11: ...3 Personnel and qualifications 3 4 3 4 Safety notes 3 5 3 4 1 General safety notes 3 5 3 4 2 Notes on specific hazards 3 5 3 4 3 Electrical connection 3 6 3 4 4 Process gas 3 7 3 4 5 Compressed air su...

Страница 12: ...serious injury or death ATTENTION Potentially hazardous situations that can lead to minor physical injury This can also be used for property damage NOTE Denotes information that can make it easier to...

Страница 13: ...em is designed as a device with overpressure encapsulation and rinsing by compressed air The system is intended according to the marking for use in an EX zone acc to NEC Class 1 Division 2 Group D Det...

Страница 14: ...e safety regulations especially those regarding explosive areas NOTE Changes to the electric installation equipment or gas bearing modules by persons without corresponding authorisation qualification...

Страница 15: ...ional safety notes before the corresponding chapters 3 4 2 Notes on specific hazards DANGER After installation all gas conducting parts must be checked for leaks according to national internal regulat...

Страница 16: ...ines When the system has been opened the parts identified by the adjacent symbol may still be live even when the master switch has been turned off If necessary disconnect system from the voltage mains...

Страница 17: ...ed to be clean and free of residue Impurities can enter the calorimeter and cause incorrect measurements and or damage The inlet pressure for the gas connections must not exceed the values specified i...

Страница 18: ...erates the protective functions against explosions by purging and creating an overpressure Establishing compressed air connections and working on the compressed air equipment of the system may only be...

Страница 19: ...ntilation NOTE Flue gases residual heat must be emitted to the open air through a suitable exhaust system 3 5 Operator safety precautions WARNING The operator needs to provide suitable safety equipmen...

Страница 20: ...rator must perform a workplace risk analysis if applicable independent of the CE marking approval of this combustion calorimeter Technical developments can give rise to deviations from these operating...

Страница 21: ...tem 4 1 Main switch 4 2 4 2 Compressed air purged and pressurised encapsulated housing GFK 4 2 4 3 Locks and door of the protective cabinet 4 2 4 4 Flame arresters 4 2 4 5 Cable line glands 4 2 4 6 Pr...

Страница 22: ...ngression of explosive gas mixed into the housing Openings of the housing are designed in such a way that transfer of a potential ignition hazard to the outside is prevented 4 3 Locks and door of the...

Страница 23: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 4 3 4 7 Markings and warning system Fig 4 2 Markings and warnings 1 Type plate 2 Warnings purge duration switching on 2 1...

Страница 24: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 4 4 Fig 4 3 Markings and warnings terminal boxes 1 Warning note electricity 2 Warning note hot surface 1 1 2 2...

Страница 25: ...4 4 Process gas 5 9 5 4 5 Connection of process and calibration gas 5 10 5 4 6 Compressed air connection 5 11 5 4 7 Electrical connection 5 12 5 4 8 Electrical interfaces 5 12 5 4 9 Operator safety p...

Страница 26: ...ns of the system Fig 5 1 Connections of the system 1 Outlet flue gas compressed air 2 Connection of signal lines 3 Connection of power supply 4 Protective ground connection multiple points 5 Compresse...

Страница 27: ...Union Instruments GmbH 5 2 Transport WARNING Risk of injury defective Transport damage can impede the protective function of the protective housing In case of damage to the transport packaging or indi...

Страница 28: ...transport can impair the protective housing Therefore check system protective housing after transport for damage In case of damage during transport from improper handling the carrier should perform a...

Страница 29: ...elative humidity Ambient pressure 700 1400 hPa 0 7 1 4 bar 5 4 Installing and connecting DANGER Risk of explosion Danger due to invalid cable glands If improper cable glands are used the explosion pro...

Страница 30: ...t Insure a clean sufficient amount of compressed ambient air for undistorted measurements Ensure that the load bearing capacity of the environment is sufficient Design sufficient space on the sides fo...

Страница 31: ...d Provide suitable means of attachment Ensure sufficient space for operating maintenance the system Ensure sufficient load bearing capacity of the environment and the means of attachment WARNING Dange...

Страница 32: ...sealing surfaces If seals are damaged seals and the doors closed improperly the explosion protection cannot be ensured any more If the doors are improperly locked the explosion protection cannot be en...

Страница 33: ...ymore Always close open drilled holes and unused line glands with approved sealing plugs Observe the technical data when selecting replacing suitable sealing plugs NOTE The connecting parts need to be...

Страница 34: ...using of the system see Fig 5 1 Screw connections see provided operating instructions The inlet for process and calibration gas to the protective housing and combustion calorimeter is already connecte...

Страница 35: ...ith the screw connection and to the housing of the system see Fig 5 1 The inlet for compressed air to the protective housing and combustion calorimeter is already connected Fig 5 3 Purge air supply an...

Страница 36: ...peration in potentially explosive atmospheres e g IEC EN 60079 14 as well as national regulations The cable gland must meet the requirements of EX zones and be matched to the cable and the threaded ho...

Страница 37: ...5 4 Electric connection system power supply X16 Assignment see provided wiring diagram Connect the system via terminals L1 N PE to the voltage supply according to national internal regulations X16 16...

Страница 38: ...X14 1 lower row Process X17 4 NO X17 3 nnG1 2 X14 2 X17 6 NC X17 5 nnG1 3 X14 3 X17 8 Relay K2 COM X17 7 nnG1 4 X14 4 Service request X17 10 NO X17 9 nnG1 5 X14 5 X17 12 NC X17 11 nnG1 6 X14 6 X17 14...

Страница 39: ...ONS CWD2005 SPC chapter page 5 15 WARNING Outputs relay analog digital and inputs must only be operated with safety extra low voltage Do not connect to mains supply voltage Maximum load of the relay c...

Страница 40: ...be diverted into a safe environment Identify the exit point of the diverted gas with a warning Danger of stumbling over improperly laid supply lines Install the supply lines in a suitable manner 5 5...

Страница 41: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 5 17 5 6 Documentation NOTE Union Instruments GmbH recommends keeping a maintenance manual and documenting all jobs and tests...

Страница 42: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 5 18...

Страница 43: ...PC chapter page 6 1 6 Commissioning operation removing from service 6 1 Commissioning start up 6 2 6 2 Description of the workplaces operating elements 6 4 6 2 1 Workplaces 6 4 6 3 Operation 6 4 6 4 D...

Страница 44: ...the requirements X X Check if the system is attached safely X Check that the gas analysis device is suitable for the process gas X Check that the process gas is correct X Check that the calibration g...

Страница 45: ...upply when combustion calorimeter is configured with automatic calibration NOTE For first stating or starting up after a long downtime back up the configuration of the system gas analysis device Let a...

Страница 46: ...otective function by purging and overpressure 6 2 1 Workplaces Fig 6 1 Workplaces Item No Designation Function activity 1 Main switch Switch on off de energises the system 2 Pressure display manometer...

Страница 47: ...an overpressure of 1 0 inWC is displayed In order to ensure the protection function and automatic analysis operation check the pressure indicator display in the safety range green range 1 0 inWC check...

Страница 48: ...on of the system gas analysis device Let a service technician do the backup or ask Service for special instructions Steps Turn off Decommi ssioning Turn off the main switch X X Rinse system for 30 min...

Страница 49: ...page 7 1 7 Maintenance and service 7 1 Service 7 2 7 1 1 Preparations 7 2 7 1 2 Maintenance work Inspection 7 4 7 2 Troubleshooting 7 5 7 2 1 Preparations 7 6 7 2 2 Changing replacing fuses 7 6 7 2 3...

Страница 50: ...eparations The feed lines to linked system components can be closed for servicing purposes Once operation has been resumed they need to be reopened DANGER Serious risk of injury from electricity The p...

Страница 51: ...r purging and overpressure There is no protection against explosions Bridging only for service and maintenance work Bridging only by authorised trained staff Use suitable measures warnings to prevent...

Страница 52: ...nce schedule The type and extent of the wear depends on the individual application and operating conditions Thus all maintenance intervals specified are guide values only Maintenance work at the gas a...

Страница 53: ...ths latest annually or when required Observe related operating instructions of the combustion calorimeter and other components 7 2 Troubleshooting DANGER Loss of protective function After several shor...

Страница 54: ...aintenance works shut down the combustion calorimeter and if necessary any connected system components Turn off main switch disconnect from power supply if necessary and secure against connecting turn...

Страница 55: ...xhaust air duct system Check free flow of compressed air in all concerned lines connections 7 3 Service NOTE If you have any questions Union Instruments GmbH will be happy to assist In case of orders...

Страница 56: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 7 8...

Страница 57: ...ion calorimeter WARNING Risk of injury from electricity and exiting gases in the combustion calorimeter if applicable If necessary purge the gases E g by running a calibration with ambient air Before...

Страница 58: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 8 2...

Страница 59: ...cations replicas of used and wear parts can cause defects and be hazardous This will render the warranty null and void The operator is liable for incurring damage When replacing standard components on...

Страница 60: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 9 2...

Страница 61: ...ration of conformity 2 1 Electrical connection 3 6 5 12 Electrical interfaces 5 12 Error elimination 7 5 Ex characteristic 1 1 G Gas connection 5 10 I Inspection 7 4 Installing the system 5 5 M Mainte...

Страница 62: ...terminal boxes 4 4 Fig 5 1 Connections of the system 5 2 Fig 5 2 Terminal block inlet process and calibration gas 5 10 Fig 5 3 Purge air supply and distribution 5 11 Fig 5 4 Electric connection syste...

Страница 63: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 10 3...

Отзывы: