![Unimag Uni-flame Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/unimag/uni-flame/uni-flame_instruction-manual_3820987024.webp)
1. Follow the set up procedure steps 1 to 9
2.
Fit mixer to the blowpipe handle and tighten by hand
3.
Install appropriate welding tip (refer to manufactures chart (Chart 3) for tip size and set pressures for procedure to be
preformed)
4.
Adjust welding tip alignment by loosening mixer to correct the angle of the tip for operators safety and comfort and
tighten mixer and
CHECK FOR LEAKS.
Set up procedure for oxy acetylene welding
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
9
8
7
6
5
4
3
2
1
10a
11a
12a
13a
14a
15a
16a
17a
18a
19a
20a
21a
22a
23a
24a
25a
9
a
8
a
7a
6a
5a
4a
3a
2a
1a
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
9
8
7
6
5
4
3
2
1
10a
11a
12a
13a
14a
15a
16a
17a
18a
19a
20a
21a
22a
23a
24a
25a
9
a
8
a
7a
6a
5a
4a
3a
2a
1a
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
9
8
7
6
5
4
3
2
1
10a
11a
12a
13a
14a
15a
16a
17a
18a
19a
20a
21a
22a
23a
24a
25a
9
a
8
a
7a
6a
5a
4a
3a
2a
1a
23