PART II: INSTALLATION
26
Siemens CD attached to the burner
Configuration with separate electrical panel (optional)
The length of the electrical cables must comply with the provisions in the technical sheets of the equipment or the advice the company
gives at the time of the offer/contract.
Provide sufficient protections for cables and connectors, taking into consideration positioning spaces and the panel-burner tracing sur-
faces. Always consult beforehand the electrical drawings supplied in relationship to the topography of the feeding systems.
Key
C - Capacitor (22 nF , 250 V)
LME / LMV - Siemens control box
R - Resistor (1M
Ω
)
M: Terminal 2 (LGB, LME), Terminal X3-04-4 ( LMV2x, LMV3x,
LMV5, LME7x)
RC466890660 - RC Siemens filter
LMV2/3.. - LMV5..
M
Содержание TLX115
Страница 45: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Страница 52: ...8 Parameters level heating engineer...
Страница 94: ...50 ERROR CODE TABLE...
Страница 95: ...51...
Страница 96: ...52...
Страница 97: ...53...
Страница 98: ...54...
Страница 99: ...55...
Страница 100: ...56...
Страница 101: ...57...
Страница 102: ...58...
Страница 103: ...59...
Страница 104: ...60...
Страница 105: ...61...
Страница 106: ...62...
Страница 107: ...63...
Страница 108: ...64...
Страница 110: ...66 Wiring variants for LMV27 2 Fuel meter input 1 Supply fuel meter ConnectorX75 ConnectorX5 02 ConnectionsPmax...
Страница 113: ......
Страница 114: ......
Страница 115: ......