C.I.B. UNIGAS
- M03956CR
13
spacer to move the burner backwards or to design a blast tube tha suites the utilisation (please, contact the manifacturer).
Gas train connections
The next figures show the gas train components wich are included in the delivery and those wich must be fitted by the customer. The
diagram complies with regulations in force.
Fig. 4
Key
a) Heat output in kW
b) Lenght of the flame tube in meters
c) Flame tube firing intensity in MW/m
3
d) Combustion chamber diameter (m)
Fig. 4 - Firing intensity, diameter and lenght of the test flame tube as a function of the heat
input in kW.
ATTENTION:
BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED. READ CAREFULLY THE “WARNINGS” CHAPTER AT THE BEGINNING
OF THIS MANUAL.
Rp1 1/2 - Rp2: Gas train with valves group MB-DLE (2 gas pressure go pressure switch) + leakage control
VPS504
Rp2 - DN65 - DN80: Gas train with valves group VGD with built-in gas pressure go gas proving system VPS504
Rp2: Gas train with valves group MBC (2 gas pressure governor) + VPS504 gas proving system
1
2
3
4
5
7
8
9
4
MANUFACTURER
INSTALLER
3
1
2
5
4
6
7
8
10
4
MANUFACTURER
INSTALLER
1
2
3
4
5
7
8
18
4
MANUFACTURER
INSTALLER