
PART III: OPERATION
50
FLUIDICS KW3...60°
NOZZLE SUPPLY PRESSURE = 20 bar.
VISCOSITY AT NOZZLE = 5 cSt
Pressure on return (bar)
Flow rate
[k
h/h]
The nominal size of the nozzle is indicated at the ends of the
curve
Pressure on return (bar)
Flow rate
[k
h/
h]
The nominal size of the nozzle is indicated at the ends of the
curve
Pressure on return (bar)
Flow rate
[k
h/
h]
The nominal size of the nozzle is indicated at the ends of the
curve
Содержание HRX92R-FGR
Страница 46: ...PART III OPERATION 46 Fig 25...
Страница 47: ...PART III OPERATION 47...
Страница 61: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Страница 68: ...8 Parameters level heating engineer...
Страница 110: ...50 ERROR CODE TABLE...
Страница 111: ...51...
Страница 112: ...52...
Страница 113: ...53...
Страница 114: ...54...
Страница 115: ...55...
Страница 116: ...56...
Страница 117: ...57...
Страница 118: ...58...
Страница 119: ...59...
Страница 120: ...60...
Страница 121: ...61...
Страница 122: ...62...
Страница 123: ...63...
Страница 124: ...64...
Страница 126: ...66 Wiring variants for LMV27 2 Fuel meter input 1 Supply fuel meter ConnectorX75 ConnectorX5 02 ConnectionsPmax...
Страница 129: ......
Страница 130: ......
Страница 131: ......