![Unigas HR512A Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/unigas/hr512a/hr512a_manual-of-installation-use-and-maintenance_842296041.webp)
PART III: OPERATION
41
NOZZLE SUPPLY PRESSURE = 20 bar
Example (Bergonzo):
if a 220kg/h flow rate BERGONZO nozzle is provided, set the return pressure at 11bar, supply at 20bar on the
delivery to get a 220kg/h flow rate. If the return pressure needed is 5bar, instead, act on the
V
adjusting screw on the pressure gover-
nor. The flow rate will then be about 95kg/h (see the example showed on the Bergonzo diagram).
Содержание HR512A
Страница 42: ...PART III OPERATION 42 Fig 18 ...
Страница 51: ...PART IV MAINTENANCE 51 12 0 BURNER EXPLODED VIEW ...
Страница 53: ......
Страница 54: ......
Страница 55: ......