PART II: INSTALLATION
15
MultiBloc MB-DLE - Assembling the gas train
4 Proving system pressure switch - PGCP
9 Antivibration joint (*optional)
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE
10 Manual valve(*optional)
MULTIBLOC DUNGS
MB-DLE 405..412
MB-DLE 415..420
Mounting
1
Mount flange onto tube lines: use appropriate sealing agent
2
Insert MB-DLE: note position of O rings
3
Remove MultiBloc between the threaded flanges
4
After installation, perform leakage and functional test
5
Disassembly in reverse order
A
B
C
D
(A)
MOUNTING POSITIONS
A
B
MB-DLE 405.. 412
(B)
(C)
(D)
MB-DLE 415.. 420
(O-Ring)
Содержание G225X
Страница 41: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Страница 48: ...8 Parameters level heating engineer...
Страница 90: ...50 ERROR CODE TABLE...
Страница 91: ...51...
Страница 92: ...52...
Страница 93: ...53...
Страница 94: ...54...
Страница 95: ...55...
Страница 96: ...56...
Страница 97: ...57...
Страница 98: ...58...
Страница 99: ...59...
Страница 100: ...60...
Страница 101: ...61...
Страница 102: ...62...
Страница 103: ...63...
Страница 104: ...64...
Страница 106: ...66 Wiring variants for LMV27 2 Fuel meter input 1 Supply fuel meter ConnectorX75 ConnectorX5 02 ConnectionsPmax...
Страница 109: ......
Страница 110: ......
Страница 111: ......