Depth Guage Installation
NOTE: SPRING TENSION MAY DECREASE
SOMEWHAT WITH EXTENSIVE USE. TO
RESTORE TENSION, REMOVE THE SPRING
AND STRETCH A COUPLE OF INCHES AND
THEN REPLACE SPRING.
WARNING: CHAIN TENSION MUST BE MONI-
TORED DURING USE. IF THE CHAIN BE-
COMES LOOSE IT MAY CAUSE DAMAGE OR
INJURY.
Depth Guage Installation
Instructions
TOOLS REQUIRED:
1/2 inch wrench (or 13mm)
Loctite 272-(provided)
17/64 Drill Bit
Center Punch
1. Remove the Bar from the
powerhead. Clean bar if it has
been used.
2. Mark the bar for hole positions
using the template provided. For
precise drilling use a center
punch.
3.. Replace the bar onto
the powerhead and install
chain. Adjust chain to
proper tension.
4. Slide Depth Gauge over
bar and chain. Line Depth
Gauge studs up to holes in
bar and insert.
5. Apply Loctite 272
(provided) to Depth Gauge
studs.
6. Plunge the gauge
several times to check for
binding. Use a spray
lubrication such
as WD 40
for easy sliding.
6. Put stud nuts on and
tighten.
WARNING: Do not over
tighten Depth Gauge stud
nuts.
NOTE: USE LOCTITE 272 (OR COMPARABLE)
ON ALL BOLTS AND NUTS ON THE DEPTH
GAUGE. LOCTITE 272 IS A HIGH STRENGTH
HEAT RESISTANT FASTENER ADHESIVE THAT
MAY REQUIRE HEATING THE AREA AROUND
THE FASTENER FOR REMOVAL.
Page 8