Page
13
of
19
email: [email protected]
Copyright 2017 Unifire
Figure 3 - PHE Wiring Schematics
For low voltage power supply signal wiring, it is recommended to use #14 multi-strand copper RW90
or similar.
A #14 AWG ground wire should also be wired to the “eHEnergizer” Ground (G) terminal.
A 3A slow blow fuse should be provided in the PHE-24 power supply circuit.
A 2A slow blow fuse should be provided in the PHE-120 power supply circuit.