POWER SUPPLY ALIGNMENT
1.
AVR UNIT (PC-082) ALIGNMENT.
1-1.
Test Equipment Required
(
1
) DC Voltage Meter.
1-2.
Voltage Measurement and Adjustment.
(1)
8.2V DC Power Source:
Connect DC Voltage meter to Pin 3 of J651, and adjust potentiometer
R659 to get 8.2V
±
0.2V of meter readings.
(2)
6V DC Power Source:
Connect the meter to Pin 5 of J651, and check that the meter reading
indicates within 5.5 – 6.5V.
This process should be made after completion of (1) as mentioned above.
(3)
5V DC Power Source:
Connect the meter to Pin 9 of J651 and adjust potentiometer R653 to get
5V +0.2 - 0.1V of meter readings.
(4)
R.I.T Power Source:
Connect the DC meter to Pin 6 of J651 and adjust potentiometer R662 to
get 1.3V
±
0.1V of meter readings.
Содержание 2020
Страница 20: ...UNIDEN 2020 Sid 20 26 0 1 uS DIV 0 1 uS DIV 5 uS DIV 5 uS DIV 0 5 uS DIV 0 5 uS DIV 1 A 1 B 1 A 1 C 1 D 1 D 1 C...
Страница 21: ...UNIDEN 2020 Sid 24 26 PLL Unit PC 086 Operation Unit PC 085...
Страница 22: ...UNIDEN 2020 Sid 21 26 1 E 1 F 1 G 1 H 1 H...
Страница 23: ...UNIDEN 2020 Sid 22 26 5 uS DIV 0 1 uS DIV 0 1 mS DIV 5 uS DIV 0 1 mS DIV 1 I 1 I 1 J 1 J 1 K...
Страница 24: ...UNIDEN 2020 Sid 23 26 2 C 2 B 2 D 2 A 2 D 20 Us DIV 0 1 Us DIV 1 Us DIV 0 1 Us DIV 20 Us DIV 20 Us DIV...
Страница 25: ...UNIDEN 2020 Sid 25 26...
Страница 26: ...UNIDEN 2020 Sid 26 26...